Loading...
HomeMy WebLinkAbout10/24/1994PLANNIN--G- 1N E Ebb., 7:00 P.M. South Coast Air Quality Management District Auditorium 21865 East Copley Drive Diamond Ear, California 1//// II" Daidd Meyer r Plunk Bruce Ramenbaum .Doff Schad •/ / Fong Copies of staff reports or other written documentation relating to agenda items are on file in the Community Development Office, located at 21660 E. Copley Drive, Suite 190, and are available for public inspection. If you have questions regarding an agenda item, please call (909) 396-5676 during regular business hours. In an effort to comply with the requirements of Title II of the Americans with Disabilities Act of 1990, the City of Diamond Bar requires that any person in need of any type of special equipment, assistance or accomodation(s) in order to communicate at a City public meeting must inform the Community Development Department at (909) 396-5676 a minimum of 72 hours prior to the scheduled meeting. Please refrain from smoking, eating or drinJ in the Auditorium ,he City of Diamond Bar uses recyeted paper and encourages you to do the same. .4 CITY OF DIAMOND BAR PLANNING COMMISSION AGENDA Monday, October 24, 1994 Next Resolution No. 94.22 CALL TO O'1 ii p.m. PLEDGE OF ALLEGIANCE ROLL CALL: COMMISSIONERS: Chairman David Meyer, Vice Chairwoman Lydia Plunk, Bruce Flamenbaum, Don Schad and Franklin Fong MATTERS FROM THE AUDIENCE/PUBLIC COMMENTS: This is the time and place for the general public to address the members of the Planning Commission on any item that is within their jurisdiction, allowing the public an opportunity to speak on non-public hearing and non -agenda items. Please complete a Speaker's Card for the recording SecretM (Completion of this form is voluntary). There is a five minute maximum time limit when addressing the Planning Commission. OLD BUSINESS: None NEW BUSINESS: None CONTINUED PUBLIC HEARING: 1. Conditional Use Permit No. 94-3 This is a request to relocate an existing dry. cleaning plant which provides retail services to other dry cleaners as well as the general public. The dry cleaner is moving to a different unit within the same commerical center located on the northeast corner of Grand Avenue in the Ralphs Center. Property Location: 1164 Diamond Bar Blvd., Diamond Bar, CA 91765 1 Applicant: Nikko Capital Corporation, 3961 Mac Arthur Blvd., Ste 105, Newport Beach, CA 92660 Property Owner: Nobuo Okumura, 25812 Maple View Drive, Laguna Hills, CA 92653 Environmental Determination: Pursuant to the provisions of the - California Environmental Quality Act (CEQA), the City has determined that this project requires a Negative Declaration. RECOMMENDATION: The staff recommends that the Planning Commission approve Conditional Use Permit No. 94-3, with Findings of Fact and conditions as listed. PUBLIC HEARING: 2. CONDITIONAL USE PERMIT NO. 91-1(1)/ DEVELOPMENT REVIEW NO. 94-1: The Conditional Use Permit application is a request for the development of Phase 1 of a Medical Complex with professional offices and urgent care facilities pursuant to Conditional Use Permit No. 91-1 approved by the Planning Commission in February, 1993. The application additionally requests an amendment to increase the Diagnostic and Treatment Center from 24,700 sq. ft. to 28,000 sq. ft., the medical office building from 40,000 sq. ft. to 45,000 sq. ft., and to remove the 13,500 sq. ft. Hotel/Recovery Center and helipad from this phase. The total square footage of the proposed project is reduced 17 percent from the current entitlement. The Development Review application is a request for approval of the architectural features and materials that ,are proposed in the project's construction. No other permits are requested as a part of this application. The project is located at 887 Grand Ave. within Zone CM -PD -BE (Commercial/Manufacturing-Planned Development - Billboard Exclusion). Property Owner: Inter -Community Health Services, 303 N. 3rd. Ave., Covina, CA 91722-5108 Applicant: DASCO West, 1012 Prospect St. #300, La Jolla, CA 92037 Environmental Determination: An Environmental Impact Report has been prepared for the project. The scope of the EIR evaluates the three phase project. Phase 1, as proposed, is within the scope of analysis addressed within the document. Pursuant to the California Environmental Quality Act (CEQA), the City has made a 2 determination that no additional analysis is necessary, as the impacts associated with the Phase 1 project have been addressed in EIR No. 91-4, as certified by the Planning Commission on April 12, 1993. RECOMMENDATION: Staff recommends that the Planning Commission, upon conclusion of the public hearing, adopt the attached Resolutions of Approval with the Findings of Fact and conditions as listed. PLANNING COMMISSION ITEMS: INFORMATIONAL ITEMS: ADJOURNMENT: November 14; 1994 3 lug Relocation of a Dry Cleaning Plant OCTOBER 10, 1994 PLANNING COMMISSION PACKET City of Diamond Bar PLANNING COMMISSION Staff Report AGENDA ITEM NUMBER: 2 REPORT DATE: October 13, 1994. MEETING DATE: October 24, 1994 CASE/PROJECT NUMBER: Conditional Use Permit No. 91- 1(1) [ CUP No. 91-1(1) 1 /Development Review No. 94-1 APPLICATION REQUEST: A request to amend the CUP, gr4nted,fbr a three-phase dev'elopmefit, in order to` allow a different arrangement of the floor akea''by'type of use. Additionally, an Extension of Time to begin constrtictionz-is requested. The Development Review application is a request for determination of exterior architecture and materials compliance.. PROJECT LOCATION: 887 Grand Avenue APPLICANT: DASCO West 1012 Prospect St., #300 La Jolla, CA 92037 1 PROPERTY OWNER: Inter -Community Health Services, Inc. 303 North 3rd. Ave. Covina, CA 91722 BACKGROUND: The Inter -Community Medical Plaza project was approved by the Planning Commission on April 12, 1994 as a three phase project that would span approximately 425,000 sq. ft. at the conclusion of the final phase. An umbrella conditional use permit was granted by the Commission that set forth parameters that each development phase is to conform to. The Commission mandated that each development phase was to undergo Development Review and environmental review. C. VENERMEFORMCUP914A 1 The applicant, DASCO West specializes in the construction of medical facilities. As agent for Inter -Community Health Services in conjunction with Citrus Valley Health Care,, the applicant is proposing an amendment to Phase I of the project. The first phase had been proposed to include the following: PHASE I PHASE I DIFFERENCE COMPONENTS APPROVED COMPONENTS PROPOSED 1. Diagnostic and 1. Diagnostic and Increase of 3,29.5 Treatment Center Treatment Center square feet 24,705 square feet 28,000 square feet 2. Medical office 2. Medical office increase of 5,000 Building Building square feet 40,000 square feet 45,000 square feet 3. Hotel/Recovery Recovery Center (14 Included as a part ,Center (20 beds) beds) of the Diagnostic 13,500 square feet and Treatment Center ,14. Helipad 1Omitted IN/A TOTAL REDUCTION 78,000 sq. ft. 73,000 sq. ft. 5,000 sq. ft. ANALYSIS: Project overview Site Review The medical plaza is located on a 43 acre site situated south and west of the intersection of Golden Springs Drive and Grand Avenue. The site is designated as an office/Professional Planned Development, The site is currently zoned R-4 (Unlimited Residence Zone) and C -3 -BE (Unlimited Commercial Zone). The residential zone is located on southernmost parcel and is comprised of hillsides. The hillsides extend to the condominium project located approximately 150 feet above and to the south the project site. The hillside is not proposed for development and is to be maintained in its present state. The graded northern portion of the parcel which overlooks the Calvary Chapel site is zoned C-3 and is the proposed site of the development. The zoning and the draft General Plan land use designation allow the land use and the proposed plan is in compliance with the development criteria. Property surrounding the site is comprised of multi -family CV27TERS\REAORMCUP914A 2 residential development to the south and east, a -single residential development overlooks the site from the southeast, to the west lies a undeveloped parcel that is an extension of the open space buffer area rimming the perimeter of the Gateway Corporate Center. The 28 acre Calvary Chapel site is located to the north of the Inter -Community site and is partially developed. The intersection of Golden Springs Drive and Grand Avenue is located approximately 1,800 feet north of the site and is developed by a retail/office commercial complex and the Diamond Bar Golf Course. The SR 57 and 60 Freeway interchange lies further to the north. The entrance to the site will be accessed from Grand Avenue at the location of the existing traffic signal which controls ingress/egress at the Diamond Brothers' condominium site. The approach will necessitate the construction of a retaining wall that ranges in height from 3 ft. to a.maximum of 21 ft. at the steepest portion of the slope away from the Grand Ave entrance and toward.the central portion of the site. At a future date this entrance is proposed as the main entrance serving this development and also future development on the site currently developed by Calvary Chapel. There is an additional "right turn in and out- only" access located south of*the main entrance primarily designed to handle service trucks. The Planning Commission conditioned the project to provide a thematic design for.the entrance which would be noteworthy. The applicant has incorporated an entry statement into the retaining wall that is required for the entrance into the site from Grand Ave. The project proposes signage on the retaining wall and a planter which helps to reduce the visual impacts imparted by the retaining wall. Additionally, the applicant has presented a preliminary landscape plan which features drought tolerant plants and light bollards intermingled with a pallet of street trees running the length of the driveway approach. The project is proposed for the approximately 26 acre area that is currently graded. The foot print for the medical plaza at buildout will be approximately 118,000 square feet. The complex is designed with setbacks as follows: Side yard setback: east, 300 ft., west, 690 ft.; front setback: 270 ft.; rear setback: 400 ft. The conceptual design has been approved as a part of the previous CUP approval, with varying heights that range from 20 ft. to 75 ft., with the tallest portions of the development situated primarily at the rear elevations. The buildings step the height down as one moves to the side and front elevations, effectively minimizing the massiveness of the development. The Phase I project proposes to construct a three story 45,000 sq. ft. medical office building and an attached one story 28,000 r_A=ERSVZF-VRMCUP91-1A 3 sq. ft. Diagnostic and Treatment Center, with a penthouse for roof top equipment. The design of the current phase conforms to the criteria requiring the buildings to exhibit the most massive portions of the development in central locations and to reduce 'heights on the perimeter elevations. The medical office building is designed with three stories with a maximum height not to exceed 50 ft. although the approval allowed up to 75 ft. The diagnostic treatment center will be constructed as a single floor structure not to exceed 24 ft. in height. All rooftop mechanical equipment will be concealed behind a parapet constructed of mater * ial identical to the remainder of the building and within the allowable height envelope. The architecture is consistent with the conceptual design approved by the Commission. The exterior materials are substantially the same as the pallet of materials approved by the Commission. The'chap qes are minor and are necessary because of the discontinuation of certain materials. The replacement materials are similar in color and in quality. The two structures have uses which are independent of each other although the buildings are connected by a breezeway. The design concept integrates the separate uses together in separate buildings which in Phase II will become an interconnected campus. At the completion of the final phase the project will be almost a mirror image of itself as the final phase proposes to duplicate almost all of the previously constructed phases. The Phase I building setbacks for the project required that the building footprints be set back 300 ft. from Grand Ave. and 270 ft. from the front property line. The proposal maintain 350 ft. to the Grand Ave. setback and a distance of approximately 300 ft. to the front property line. I Parking for the project is designed as surface parking during this initial phase.of development. The project proposes in 374 parking spaces and the preliminary review determined that the project required a minimum of 361 spaces. No compact spaces are proposed as a part of the design. The only substantial change is for handicap parking provisions which have been revised dramatically in response to the new American Disabilities Act' (ADA) requirements. Fully 10 percent of all parking spaces are required to be incorporated into the project specifically for handicap parking. Additionally, these spaces are to located around the perimeter of the main entrance to facilitate unobstructured access. The applicant has been required to work with the adjacent property owner, Calvary Chapel, to begin to devise a connection for access to Grand Avenue. The applicant has had some C.V.MERS"FORMCUPW-IA 4 preliminary negotiations with the adjacent property owner but no final resolution has been resolved. No action is required for this phase of development although the conditions of approval require substantiation that effort to that end has been pursued. The applicant is requesting that the Planning Commission grant a one year extension to the CUP, pursuant to Condition No. 32, in order that the project can continue to proceed in a timely manner. The extension would cover the project in the event an unforeseen obstacle might arise. To grant the extension, staff does not feel that the City would be placed in an untenable situation to deal with future pha ses of the project. ENVIRONMENTAL ASSESSMENT: As part of the processing of the project staff required that an Environmental Impact Report be prepared. The EIR analyzed the overall three phase pkoject and set forth a Mitigation Monitoring Program (MMP) that extended over each phase of the project and is required to be reviewed as a part of the Development Review process that each subsequent phase will undergo. The primary impacts identified in the EIR focused on the traffic, noise, visual impacts, and waste disposal. There is -also a discussion and analysis of the other potential impacts including but not limited to infrastructure, utility service - and impacts on the wildlife which are endemic to the site. For the Phase I development, staff has reviewed the previously certified document and determined that the worst case scenario identified in the EIR has adequately addressed the elements of this project. As a result of this determination, State law requires that the City file a statement,,include as the Conformity Report, which states that the Phase,I project is in compliance to the certified EIR. CONCLUSION: The Phase I project is a request for approval of a less intensive full service development than had been approved by the Planning Commission. The project conforms to all of the development standards set forth in the umbrella CUP grant and with the conceptual design and materials pallet presented and approved. The three story medical office building is located approximately 350 ft. from Grand Ave. and is proposed to reach a height of 45 ft. The companion Diagnostic/Treatment Center facilty is designed as a.one story facility approximately 24 ft. in height. All materials incorporated into the exterior finish substanially conform to the pallet originally approved by the Planning 5 Commission. The parking plan has been designed in excess of the development standards for number of spaces as set forth and does not include any compact parking spaces. The environmental review of the project has deemed the proposed Phase I in conformance with the impacts identified and mitigated in Environmental Impact Report No. 91-4. The EIR focused on a more dense Phase I (allowing up 88,205 sq. ft.) project and therefore staff has determined that the no additional impacts will be created as a part of this Phase. The findings of the City are enclosed in the Conformity Report. (see attached) PUBLIC NOTIFICATION: The notice for this project was published in the San Gabriel Valley Tribune and the Inland Valley Daily Bulletin on October 10, 1994. Public hearing notices were mailed to 883 property owners on October 14, 1994. Staff recommends that the Planning Commission upon conclusion of the public hearing and adopt the attached Resolutions of Approval with the Findings and conditions as listed. CONDITIONAL USE PERMIT FINDINGS OF FACT: 1. The proposed project is in substantial compliance with the Proposed General Plan pursuant to the terms and provisions of Government Code Section 65360. 2. The proposed project will not adversely affect the health or welfare of persons residing or working in the surrounding area. 3. The proposed project will not have an adverse impact on ad- jacent or adjoining residential and commercial uses. It will not be materially detrimental to the use, enjoyment, or valuation of property of other persons located in the vicinity of the proposed project. 4. The subject site for the proposed project is adequate in size and shape to accommodate the proposed used. 5. The proposed site is adequately served by Grand Avenue. It has good visibility, easy access, and adequate parking for the proposed project. DEVELOPMENT REVIEW FINDINGS OF FACT: C.-U.VTERS'"P0RMCUP91-1A 6 1. The design and layout of the proposed project is consistent with the applicable elements of the City's draft General Plan, design guidelines and architectural criteria of the appropriate district; 2. The design and layout of the proposed development will not unreasonably interfere with the use and enjoyment of the neighboring existing and future developments, and will not create traffic or pedestrians hazards; 3. The architectural design of the proposed medical plaza is compatible with the character of the surrounding current and proposed development and will maintain the harmonious, orderly, and attractive development contemplated by this Chapter and the draft General Plan of the City; ATTTACEMENTS: Application Development Plans Environmental Conformity Report PC Resolution No. 93-11 Draft Resolutions of Approval r--VX7TMMRFPORMCUP91-IA 7 PC RESOLUTION NO. 94 -XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA CERTIFYING ENVIRONMENTAL IMPACT REPORT NO. 91-4 AND APPROVING DEVELOPMENT REVIEW No. 94-19 FOR THE REVIEW. OF THE PHASE I, 73,000 SQ. FT. INTER -COMMUNITY MEDICAL PLAZA DEVELOPMENT IN CONFORMANCE WITH CONDITIONAL USE PERMIT NO. 91-1, ON A 43 ACRE SITE LOCATED AT 887 GRAND AVENM DIAMOND BAR, CALIFORNIA, AND MAKING FINDINGS IN SUPPORT THEREOF. A. Recitals. (i) DASCO West, acting as representative for the applicant, Inter -Community Health Services, 303 W. 3rd St., Covina, California, has heretofore filed an application for certification of Environmental Impact Report No. 91-4 and approval of Development Review No. 94-1, as described in the title of this Resolution. Hereinafter in this Resolution,' the subject Development Review applications shall be referred to as "the Application". (ii) On April 18, 1989, the City of Diamond Bar was established as a duly organized municipal corporation of the State of California. On said date, pursuant to the requirements of the California Government Code Section 57376, Title 21 and 22, the City Council of the City of Diamond Bar adopted its Ordinance No. 14, thereby adopting the Los Angeles County Code as the ordinances of the City of Diamond Bar. Title 21 and 22 of the Los Angeles County Code contains the Development Code of the County of Los Angeles now currently applicable to development applications, including the subject application, within -the City of Diamond Bar. (iii) The City of Diamond Bar lacks an operative General Plan. Action was taken on this application, as to consistency to the proposed General Plan, pursuant to the terms and provisions of an Office of Planning and Research Extension of Time granted pursuant to California Government Code Section 65360 and 65361(a). (iv) On October 24, 1994 the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing on the Application and concluded said public hearing on that date. (v) All legal prerequisites to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. The Planning Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. The Planning Commission hereby finds that the initial study prepared and reviewed by the City of Diamond Bar and Environmental Impact Report No. 91-4 has been prepared for the three Phase project in compliance with the California Environmental Quality Act of 1970, as amended, and the Guidelines promulgated thereunder and further said Environmental Impact Report No. 91-4 reflects the independent judgement of the City of Diamond Bar. The City has prepared a Conformity Report which compares the Application with the project analyzed within the Environmental Impact Report No. 91-4 and has determined that the Application will create no change in the impacts or the potential impacts will be less than that anticipated in the Phase I development scenario. 3'. The Planning Commission hereby specifically finds and determines, based on the findings set forth below, that changes and alterations have been required in or incorporated into and conditioned upon the project specified in the application, which mitigate or avoid significant adverse environmental impacts identified in said Environmental Impact Report No. 91-4, except as to those effects which are identified and made the subject of a Statement of Overriding Considerations which this Planning Commission finds are clearly outweighed by the economic, social, and other. benefits of the proposed project, as more fully set forth in the Statement- of Overriding Considerations. 4. The Planning Commission hereby specifically finds and determines that, after having considered the record as a whole including the findings set forth below, and changes and alternations which have been incorporated into and conditioned upon the proposed project set forth in the application, there is no evidence before this Planning Commission that the project proposed have the potential of an adverse effect on wild life resources or the habitat upon which the wildlife'depends. Based upon substantial evidence, this Planning Commission hereby rebuts the presumption of adverse effects contained in Section 753.5(d) of Title 14 of the California Code of Regulations. Notwithstanding the findings set forth herein, the applicant shall make payment of any and all fees which the Department of Fish and Game may require to be paid prior to the issuance of any building. permit or further entitlement. 5. Based on the substantial evidence presented to the Planning Commission during the above -referenced public hearing opened on October 24, 1994 and concluded on that date, including written and oral staff reports, together with public testimony, and in conformance with the terms and provisions of California Government Code Sections 65361(4), the Planning Commission hereby specifically finds as follows: (a) The applicant's request is for approval of a 73,000 sq. ft. first Phase development of a three (3) phase, 425,000 sq. ft. medical complex to be constructed over a 20 year period. The project's development standards and criteria for development are contained within conditions of approval and conceptual architectural and site plans approved as a part of Conditional Use Permit No. 91-1. Each Phase must receive Development Review approval prior to obtaining grading and construction permits. (b) The application applies to property located at 887 Grand Avenue, Diamond Bar with a gross area of 43 acres and is zoned C -3 -BE (Unlimited Commercial Zone) and R-4 (Unlimited Residence Zone).. The draft General Plan land use designation is Office Professional Planned Development [PD (OP)]. (c) Properties to the east and south are developed with single family and multi -family residences, to the north the site is developed with a commercial office, retail commercial and a golf course and the sites to the west are partially developed by a commercial office development known as Gateway Corporate Center. (d) The subject property has previously been graded and currently is a vacant parcel. (e) The site is sufficient in size and can provide adequate ingress and egress to allow the development compatible with the surrounding current land uses. (f) The subject site lies within the draft General Plan Office Professional/Planned Development PD (OP) and Open Space (OS) land use designation. The current zoning of the site is not consistent with the land use designation. (g) Notification of the public hearing for this project has been made in the San Gabriel Valley Tribune and the Inland Valley Daily Bulletin newspapers on October 10, 1994. Notification to property owners within a 1000 foot radius was mailed on October 14, 1994, to 883 property owners. (h) The design and layout of the proposed development will not unreasonably interfere with the use and enjoyment of the neighboring existing and contemplated future developments, and will not create significant pedestrians hazards; (i) The conceptual architectural design of the proposed complex is 3 will maintain the harmonious, orderly, and attractive development contemplated by the Development Review Ordinance and the proposed General Plan of the City; (j) The design of the proposed development would provide a desirable environment for its occupants and visiting public as well as its neighbors through good aesthetic use of materials, texture and color that will remain aesthetically appealing and will retain a reasonably adequate level of maintenance. (k) The proposed use will not be detrimental to the public health, safety or welfare or be materially injurious to the properties or improvements in the vicinity and will promote these goals. (1) The subject site is adequately served by Grand Avenue and Golden Springs Drive and all required public , and private services. The site is physically suitable for the development. (m) The design and layout of the proposed development is consistent with the applicable elements of the City's draft General Plan, design guidelines and architectural criteria of the appropriate dis- trict; (n) The design and layout of the proposed development will not unreasonably interfere with the use and enjoyment of the neighboring existing and future developments, and will not create traffic or pedestrians hazards; (o) The architectural design of the proposed project is compatible with the character of the surrounding current and the proposed development and will maintain the harmonious, orderly, and attractive development contemplated by this Chapter and the draft General Plan of the City; (p) The design of the proposed development would provide a desirable environment for its occupants and visiting public as well as its neighbors through good aesthetic use of materials, texture and color that will remain aesthetically appealing and will retain a reasonably adequate level of maintenance. (q) The proposed use will not be detrimental to the public health, safety or welfare or be materially injurious to the properties or improvements in the vicinity. 4 6. Based on the findings and conclusions set forth in paragraphs 1, 2, 3, 4 and 5 above, the Planning Commission hereby approves the application subject to the following conditions: Planning Department Conditions 1. This permit shall not be effective for any purpose until a duly authorized representative of the owner of the property involved has filed, at the office of Diamond Bar Community Development Department, his affidavit stating that the applicant is aware of, and accepts all the conditions of this permit; 2. That all requirements of the . Zoning Ordinance, Conditional Use Permit No. 91-1 and of the underlying zoning of the subject property must be complied with, unless set forth in this grant and shown on the approved plans and submitted to the Community Development Director before this permit can be exercised; 3. That three copies of the revised plot plan marked Exhibit "A" and conforming to such of the following conditions as can shown on a plan, shall be submitted for approval of the Community Development Director. The property shall thereafter be developed and maintained in substantial conformance with the approved plans. 4. That the applicant must, comply with all State, Zone C -3 -BE (Unlimited Commercial -Billboard Exclusion), Engineering Department, and Building and Safety Department requirements. 5. This grant is valid for two (2) years and must be exercised (i.e. construction started) within that period or this grant will expire. A one year extension may be requested in writing and submitted to the City 30 days prior to the expiration date. 6. All construction materials must comply with materials board approved by the Planning Commission and marked as Exhibit "A- 1" and dated October 24, 1994. 7. Notwithstanding any previous Subsection of this Resolution, if the Department of Fish and Game requires payment of a fee pursuant Section 711.4 of the Fish and Game Code, payment thereof shall be made by the applicant prior to the issuance of any building permit or any other entitlement. 8. Roof finish material shall have a uniform color so as to reduce reflectivity. Additionally, all roof mounted equipment must be 5 painted a color to match the roof finish material. 9. Roof mounted equipment shall be hidden behind building parapets so as not to be visible from surrounding streets, drives or adjacent buildings on a horizontal sight line. 10. Where roof mounted equipment is not hidden from view by the building parapet, a screen must be constructed using materials complimentary with existing buildings in the area. The design of the screen will be integrated into the overall architectural design of the building. The inside surface of the screen shall be finished a grey color to match the roof finish material. 11. All parking areas shall be lighted to a 1 candle foot minimum level of illumination so as encourage utilization of the new parking spaces by employees. 12. This permit is granted in compliance with Conditional Use Permit No. 91-1(a) and shall be of no force and effect upon expiration of the conditional use permit listed above if not exercised. Public Works Department Conditions 1. Submit 3 copies of each of the following reports: soils and geology (based on the proposed grading plans for the finalized building), traffic impact analysis (based on the proposed drive approach to the site off Grand Avenue), hydrology (based on the existing/proposed drainage devices for on and off-site tributary areas and a $1,000 deposit fee for each report review. 2. Provide 3 copies of the revised site plan detailing all existing drainage devices and structures (See P.D. No. 1747 Slits. 1-7) and showing 800 S. Grand Ave. Condominium entrance and existing traffic signal at the same location. 3. Show location of proposed new sewer line on south side of Grand Ave. and hook-up for new building. Existing sewer main in Grand Ave. is on north side of street. Application for installation of this new mainline should be made as soon as possible to Los Angeles County Sanitation District No. 21. 4. Existing drainage devices and structures should be shown on plan and hydrology calculations for the proposed new development and capacity of existing devices for future run-off to be submitted to 0 the City. 5. City will require recorded drainage agreement between Inter - Community Medical Plaza and Calvary Chapel owners, if existing down drains remain. 6. Written approval to be obtained as soon as possible from Los Angeles County Flood Control District if any construction is proposed over or in the vicinity of PD 1747. Twenty one -(2 1) ft. high retaining wall and possibly the treatment center is being proposed directly over Line B of PD 1747 and car parking over several existing interceptor drains. 7. Driveway alignment opposite 800 Grand Avenue Condominium driveway should be indicated on the revised plans showing existing traffic signal and cut in median etc. 8. Fire Department approval shall be obtained. All fire lanes shall be shown on the revised plan. 9. New sidewalk to be installed along Grand Avenue property frontage. 10. The Developer shall enter into an agreement with City to complete improvements at such time as City acquires= interest in the 25 ft. additional right-of-way to be granted to the City for street widening. 6. The Planning Commission Secretary shall: (a) Certify to the adoption of this Resolution; and (b) Forthwith transmit a certified copy of this Resolution, to DASCO West, and Inter -Community Health Services at the addresses as set forth on the Application. APPROVED AND ADOPTED THIS THE 24TH DAY OF OCTOBER, 1994 BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. David Meyer, Chairman VA I, James DeStefano, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, by the Planning Commission on the 24th day of October, 1994, by the following vote: AYES: - - - CONMISSIONERS- NOES: COMWI81SIONERS: ABSENT: CONWISSIONERS: ATTEST: James DeStefano, Secretary I 3 PC RESOLUTION NO. 94 -XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR, CALIFORNIA CERTIFYING ENVIRONMENTAL IMPACT REPORT NO. 91-4 AND APPROVING A ONE YEAR EXTENSION OF TIME FOR CONDITIONAL USE PERMIT NO. 91-1, REVISION TO THE APPROVED EXTERIOR MATERIALS, AND AN AMENDMENT TO REDUCE THE TOTAL SQUARE FOOTAGE FOR THE FIRST PHASE DEVELOPMENT FROM 88,205 SQ. FT. MAXIMUM TO 73,000 SQ- FT., MEDICAL OFFICE BUILDING AND DIAGNOSTIC/ TREATMENT CENTER PROPOSED FOR A 43 ACRE SITE LOCATED AT 887 GRAND.AVENUZ, DIAMOND BAR, CALIFORNIA, AND MAKING FINDINGS IN SUPPORT THEREOF. A. Recitals. (i) DASCO West, acting as. representative for the applicant,' Inter -Community Health Services, 303 W. 3rd St., Covina, California, has heretofore filed an application for certification of Environmental Impact Report'No. 91-4 and approval of Development Review No. 94-1, as described in the title of this. Resolution. Hereinafter in this Resolution, the subject Development Review applications shall be referred to as "the Application". (ii) On April 18, 1989, the City of Diamond Bar was established as a duly organized municipal corporation of the State of California. On said date, pursuant to the requirements of the California Government Code Section 57376, Title 21 and 22, the City Council of the City of Diamond Bar adopted its Ordinance No. 14, (1989) thereby adopting the Los Angeles County Code as the ordinances of the City of Diamond Bar. Title 21 and 22 of the Los Angeles County Code contains the Developmeint Code of the County of Los Angeles now currently applicable to development applications, including thd subject application, within the City of Diamond Bar. (iii) The City of Diamond Bar lacks an operative General Plan. Action was taken on this application, as to consistency to the proposed General Plan, pursuant to the terms and provisions of an Office Of Planning and Research Extension of Time granted pursuant to California Government Code Section 65360 and 65361(a). (iv) on October 24, 1994, the Planning commission of the City of Diamond Bar 'conducted a duly noticed public hearing on the application and concluded said public hearing on that date. (v) All legal prerequisites to the adoption of this Resolution have occurred. EIR NO. 91-4/CUP 91-1 1 B. Resolution. NOW, THEREFORE, it is found, determined and resolved by the Planning Commission of the City of Diamond Bar as follows: 1. This Planning Commission hereby specifically finds that all of the facts set ---forth- in - the Recitalst Part A, of this Resolution are true and correct. 2. The Planning Commission hereby finds that the initial study prepared and reviewed by the City of Diamond Bar and Environmental Impact Report No. 91-4 has been prepared for the three Phase project in compliance with the California Environmental Quality Act of 1970, as amended, and the Guidelines promulgated thereunder and further said Environmental Impact Report No. 91-4 reflects the independent judgement of the City of Diamond Bar. The City has prepared a Conformity Report which compares the Application with the project analyzed,within the Environmental Impact Report No. 91-4 and has determined that the Application will create no change in the impacts or the potential impacts will be less than that anticipated in the Phase I development scenario. 3. The Planning commission hereby specifically finds and determines, based on the findings set forth below, that changes and alterations have been required in or incorporated into and conditioned upon the project specified in the application, which mitigate or avoid significant adverse environmental impacts identified in said Environmental Impact Report No. 91-4, except as to those effects which are identified and made the subject of a Statement of Overriding Considerations which this Planning Commission finds are clearly outweighed by the economic, social., and other benefits of the proposed project, as more fully set forth in the Statement of Overriding Considekations. 4. The Planning Commission hereby adopts the Statement of Overriding Considerations attached hereto as Exhibit "B" and hereby incorporated by reference. 5. The Planning Commission hereby specifically finds and determines that, after having considered the record as a whole including the findings set forth below, and changes and alternations which have been incorporated into and conditioned upon. the proposed projectset forth in the application, there is no evidence before this Planning Commission that the project proposed have the potential of an adverse effect on wild life resources or the habitat upon which the wildlife depends. Based upon substantial evidence, this Planning Commission hereby rebuts the presumption of adverse effects contained in Section 753.5(d) of Title 14 of EIR NO. 91-4/CUP 91-1 3 the California Code of Regulations. Notwithstanding the findings set forth herein, the applicant shall make payment of any and all fees which the Department of Fish and Game may require to be paid prior to the issuance of any building permit or further entitlement. 6. Based on the substantial evidence presented to the Planning Commission during the above -referenced public hearing opened on October 24, 1994 and concluded on that date, including written and oral staff reports, together with public testimony, and -in conformance with the terms and provisions of California Government Code Sections 65361(a), the Planning Commission hereby specifically finds as follows: (a) The applicant's request is for a one (1) year extension of time to initiate construction of a the first Phase (73,000 sq. ft.) of a three (3) Phase, 425,000 sq. ft. medical complex to constructed over a 20 year period. Additionally, the applicant is requesting a reduction of the floor area approved as an element of the Phase I project, from 88,205 sq. ft. to 73,000 sq. ft. and the revision of the building material pallet as two exterior materials are no longer available but similar replacements have been proposed. The project's development standards -and criteria for development are contained within conditions of approval , and conceptual architectural and site plans. Each Phase must receive Development, Review approval prior to obtaining grading and construction permits. (b) The application applies to property located at 887 Grand Avenue,'Diamond Bar with a gross area of 43 acres and' is zoned C -3 -BE (Unlimited Commercial Zone) and R-4 (Unlimited Residence Zone). The General Plan land use designation is office Professional Planned Development [PD (OP)]. (c) Properties to the east and south are devel- oped with single family and multi -family residences, to the north the site is developed with a commercial office, retail commercial and a golf course and the sites to the west are partially developed by a commercial office development known as Gateway Corporate Center. (d) The subject property has previously been EIR NO. 91-4/CUP 91-1 4 graded and currently is a vacant.parcel. (e) The site is sufficient in size and can pro- vide adequate ingress and egress to allow.the development compatible with the surrounding current land uses. (f The subject site lies within the Diamond Bar General Plan office Professional/Planned Development PD (OP) and open Space (OS) land use designation. The current zoning of the site is not consistent with the land use designation. (g) Notification of the public hearing for this project has been made in the San Gabriel Valley Tribune and the Inland Valley 'Daily Bulletin newspapers on October 10, 1994. Notification to property owners within a 1000 foot radius was mailed on October 14, 1994, to 883 property owners. (h) The design and layout of the proposed devel- opment will not unreasonably interfere with the use and enjoyment of the neighboring ex- isting and contemplated future developments, and will not create significant pedestrians hazards; (i) The conceptual architectural design of the proposed complex is compatible with the character of the surrounding development and will maintain the harmonious, orderly, and attractive development contemplated by the Development Review ordinance and the proposed General Plan of the City; (j) The design of the proposed development would provide a desirable environment for its occu- pants and visiting public as well as its neighbors -through good aesthetic use of materials, texture and color that will remain aesthetically appealing and will retain a reasonably adequate level of maintenance. (k) The proposed use will not be detrimental to the public health, safety or welfare or be materially injurious to the properties or im- provements in the vicinity and will promote these goals. (1) The subject site is adequately served by EIR NO. 91-4/CUP 91-1 5 Grand Avenue and Golden Springs Drive and all required public and private services. The site is physically suitable for the development. (m) The nature, condition, and size of the site is adequate in size to accommodate the project. 7. Based on the findings and conclusions set forth in paragraphs 1, 2, 3, 4, 5, and 6 above, this Planning commission hereby approves the application subject to the following conditions and restrictions. CONDITIONS OF APPROVAL 1. This permit shall not be effective for any purpose until a duly authorized representative of the owner of the property involved has f iled at the off ice of Planning Division of the Community Development Department the Affidavit- of Acceptance and accepts all the conditions of this permit; 2. The applicant must comply with all federal, state, Zone C -3 -BE, Community Development Department and Public Works Department requirements, and that all grading, drainage plans and wall plans shall conform to all City standards. 3. The project shall substantially conform to the site plan and architectural elevations as presented to the Planning commission and dated October 24, 1994. Three copies of the said site plan and elevations as depicted and dated October 24, 1994 and marked collectively as Exhibit "All and conforming to such of the following conditions as can be shown on a plan, shall be submitted for approval of the Community Development Director. All constructionmaterials must comply with the materials board approved by the Planning commission and marked as Exhibit "A-111- The property shall thereafter be developed and maintained in substantial conformance with the approved plans. 4. Approved Uses for the Phase I project include the Medical office Building (45,000 sq. ft.) and Diagnostic/Treatment Center (38,000 sq. ft.) for a total of 73,000 sq. ft. 5. Phase I construction shall have a minimum building setback of approximately 350 feet from Grand Avenue and approximately 300 feet from the front property line. EIR NO. 91-4/CUP 91-1 6 6. The property shall be maintained in a condition which is free of debris both during and after the construction, addition, or implementation of the entitlements granted herein. The removal of all trash, debris, and refuse, whether during or subsequent to construction, shall be done only by the property owner, applicant or by a duly permitted waste contractor who has been authorized by the city to provide collection, transportation, and disposal of solid waste from residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to insure that the waste contractor utilized has obtained permits from the City of Diamond Bar to provide such services. 7. This grant is extended for a period of one (1) additional year for a total of three years from the date of the original CUP approval, and must be exercised (i.e. Development Review approval obtained and construction started) within that period or this grant will expire'. 8. All other conditions of Conditional Use Permit No. 91-1 are to remain in full force and effect and are not amended unless other specifically stated above. 8. The Planning commission Secretary shall: I (a) , Certify to the adoption of this Resolution; and (b) Forthwith transmit a certified copy of this Reso- lution, to Inter -Community Hospital at the address as set forth on the application. APPROVED AND ADOPTED THIS THE 12TH DAY OF APRIL, 1993 BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. BY: Bruce Flamenbaun, Chairman EIR NO. 91-4/CUP 91-1 7 I, James DeStefano, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, by the Planning Commission on the 12th day of April, 1993 with the following vote: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: ATTEST: James DeStefano, Secretary EIR NO. 91-4/CUP 91-1 8 Exhibit "B" STATF31ENT OF OVERRIDING CONSIDERATTONS FOR THE .O,O,D DIAMOND BAR MEDICAL PLAZA As concluded in the EIR for the proposed Diamond Bar Medical Plaza (SCH No. 91-121- 027 and CUP 91-1), most environmental impacts, with the exception of the potential impacts to air quality and traffic, can be mitigated to insignificant levels. The City of Diamond Bar is located within the South Coast Air Basin which is a "non -attainment" basin and any contribution of pollutant emissions to the basin is considered a significant impact. Also, because of the size of the project, its potential air quality impacts would exceed thresholds established by the SCAQMD. Heavy traffic on Grand Avenue and Golden Springs Road and the SR -57 and SR -60 freeways will be .impacted by the proposed project. Increases in vehicle trips to and from the site can be reduced by the mitigation measures but traffic volumes on local streets are expected to lead to greater congestion in the area. The City of Diamond Bar, as the Lead Agency and final decision maker and pursuant. to the CEQA Guidelines Section 15093, after balancing the benefits of the proposed project against the unavoidable environmental effects on air quality and traffic, and notwithstanding the mitigation measures and alternatives described in the Statement of Facts and Findings for the proposed Diamond Bar Medical Plaza, ' determines that the remaining environmental effects are acceptable due to the following: ® There are not enough medical services in the area which could serve the needs of the present and future population of the area. ® Construction of the proposed Diamond Bar Medical Plaza will provide the City of Diamond Bar with accessible medical services which would include state-of-the-art facilities and medical technology. ® The project will present added opportunity for the provision of cost-effective and efficient delivery of health care services to residents of the City and surrounding communities. ® The Diamond Bar Medical Plaza combines the traditional health care facility with a hotel/recovery center that will provide ambulatory care to better meet the needs of ambulatory patients. This is expected to meet the recent trend EIR NO. 91-4/CUP 91-1 9 towards more hospital-based group practices and joint ventures between hospital and physicians.. ® The project will provide employment opportunities to area residents, as well as improve jobs/housing balance in the City. ■ The project will serve as a revenue source for the City of Diamond Bar. HOSPUAL.RES EIR NO. 91-4/CUP 91-1 a= 07 nZAAMM &U Case#u t - i U4- 316,60 Z. CGVUW Drive Suits 120 t (7141396-6476 ( 714 ) ® 3=7 Inter -Community Applicant iame ealth Services Inc. DASCO West Nick Rehnberg, Boulder Associates 303 North 3rd Ave 1012 Prospect St, #300 4747 Table Mesa -Dr., Ste 202 City Covina. CA La .colla, CA Boulder, CO iip 91722-5108 92037 80303 Dpyo (818' 331-7331 (61% 551-4922 �00 ) 499-7796 (Attanh sepwate sheet if neasresarr, LacluAlaq mama, addreemosO and s of of partnerships, joint venturm, and directozz of ) C=WMW2 e ap 9 Szeadon ®i (ALL 3 . �w , SII® Amdoeasomwo heraby var=y Undw pamity of° PUIOZ7 rage AZWwJ4wft0- printed Sams Nicholas Rehnber UREINKI or 3. May 24, . 1994 $$7 Crand Avenue, Diamond Bar ftealant use CUP no. 91-1 _ of Undeveloped use a gam. Medical complex/Professional Office, Diagnostic and Treatment Center (Hospital) (all awneCOhip eomprisia4 the lot(n)I 1($1 See attached Parcel Map Area devoted to xtzUctUrsz...j.3,.0OO s.f. Landscaping/ ea i NA is rs®) style of Archit Contemporary of ?loor�rVroposed see below Slope of f Flat with some pitched areas 1:4 slope. Medical Office - 3 stories plus mechanical penthouse Diagnostic/Treatment - 1 story plus mechanical penthouse. MAY 23 '94 12:05 CITY OF DIAMOND BAR PAGE .®02 SCALF- , •aj • SHUT T SF a SID UIS PARCEL* MAP NO ® 1481 9 IM TMI: wilimRPONATo TOMITORT OF THE �{ COUNTY OF LU AMCELES. STATE OF CALIFORHSA. e®r TOM & McGANNON, R.GE tilt% APRIL, 1a162 Le6EC0: ar. OVOCATIS oOUND&PY or TWO LAND r oaoa 1oov+nvav ar irOO war. ROC®AO "VAL /S PAM& RUL ,® ISbtO, v.q. ,avawv® utomw NOTe: rymesLs t Ini, bm.2 a 41ai1 Y6 IrrMM LG% NwK M 19t N ' O 4401. /a 0ALIsaiLa� IQR Ind 04 G%400-764 GALcj �rSyl �M 't,R ,IM2 or �N•u- q►qt - unow.ev.~s ai®saveawlrrs A 0•q arwA aanw q) qr►�v ®u► r �swaUw vRdomom w meq® AN. iAY am womm" WOOD OF oasiq UL 27O a•amom GOODS o n '�` sT s Jflia O/OTO9 A•, p.,� L•N/T Y/O 1'y/NOT O[ tO. q,RlO M,gMl�N7 P(/IRMG/t A5T16v OP r►,l .dpW,rGPY• ,yy,ry�a N r,11BL6Lt 1.t1• KC rW /O iT K Gtxa6M:K �LgOe �tAe agms stm.'�e Ate+ Arss• �tl —YLr 0Mr ar r4• Y t, Rw.l,.is+•.,. mson+at amtnu>t tto Derr eawaoo ratty t+s "Qualmem a OF ns tuaogot7n ew aGT aru � 1 Jul ZT am or ld? Y 1I b 1 ATTACHMENT A LLI Q i iV cv) "03 S3139NV SOI FS" e i EXISTING SIZE : r� ewal si p�ep w� C .s r® V i W T(D i t� E E O U C 4-0 l�J RECEIVED 10/19 08:35 1994 AT 909-861-3117 PAGE i (PRIKTED PAGE 1) 10-19-1994 Oe:381 FROM ICS TO Mr: Robert Searcy Associate Planner City of Diamond Bar 21664, Fast Copley Drive, Scute 144 Diamond Bar, CA 91765-4177 tA 4 C ITRUS •VALLEY HEALTH PARTNERS RB: diamond Bar Medical Plaza toad Easements 19M861311? P.01 The Planning Commission's approval on April 12, 1993 of Conditional Use Permit No. 91-1 for the development of the Diamond Bar Medical Plaza stipulated seventy-seven conditions for the construction of the three phase project. Condition number forty requires Citrus Valley Health Partners and Calvary Chapel to execute a reciprocal access agreement far the purposes of providing access to Golden Springs Drive as a part ofaW future development review approvals. .Int co During the October 7th meeting with our developer and city stag discussions about this condi*n J o suggested that the two owners meet and confer about an access road through Calvary Chapel's 3 parcels As suggested, we met with Mr. Bernie Grant, Assistant Minister of Calvary Chapel, OW _- Wednesday, October 12th to discuss the road easement allowing access to Golden Springs Drive? �' z Nk. Grant informed us that their organization has yet to develop a master plan for their parcel sad - are unable to respond to this issue until this is achieved. Your letter dated August 31, 1994 to lvir. Nick Rehnberg requested eight items of information needed to process our project packet for the Planning Commission's review. The only outstanding item not forwarded to you prior to this letter was item number 6 asking for a status report on the negotiations with Calvary Chapel. We hope that this letter serves to satisfy this request. We are anxious to secure the needed approvals and permits to begin construction on phase one of our project and arc grateful for your assistance and direction in achieving these goals. of you should have any questions or require any additional information please call me at (818) 814-2468 or harry Tanouye at (818) 915-6224. Sincerely, A. Foulke El Develournent W: Mr. Bernie Grant Mr. David Strachan 140 WF51. VOLLLCL S'KEE'T COVINA CA 71711 818. 89.1.3430 later-6mmunity Medica! Center , Queen of the Valiq Ilalpaid ® Hwptcr of for &wt San Gabriel Vrllcy PC RESOLUTION NO. 93-11 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR/ CALIFORNIA CERTIFYING ENVIRONMENTAL IMPACT REPORT NO. 91-4 AND APPROVING'CONDtTIONAL USE PERMIT NO. 91-1, FOR THE DEVELOPMENT OF A 425,000 SQ. FT., THREE PHASE MEDICAL COMPLEX PROPOSED FOR A 43 ACRE SITE LOCATED AT 887 GRAND AVENUE, DIAMOND. BAR,.CALIFORNIA., AND MAKING FINDINGS IN SUPPORT THEREOF. A. Recitals. (i) Inter -Community' Health Covina, California, has heretofore certification of Environmental Impact of Conditional Use Permit No. 91-1, i this Resolution. Hereinafter in t) Development Review and Conditional U: be referred to as "the application". Services, 303 W. 3rd St., filed an application for Report No. 91-4 and approval .s described in the title of Is Resolution, the subject' ;e Permit applications shall On April 18, 1989, the City of Diamond Bar was established -as a duly organized municipal corporation of the State of California. On said date, pursuant to the requirements of the California Government Code Section 57376, Title 21 and 22, the City council of the City of Diamond Bar adopted its ordinance No. 14, (1989) thereb.y adopting the Los Angeles County Code as the ordinances of the City of Diamond Bar. Title 21 and 22 of the Los Angeles County Code contains the Development Code of the County, of Los Angeles now currently applicable to development applications., including the subject application, within the City of Diamond Bar. (iii) The city of Diamond Bar lacks on operative General Plan. Pursuant to the order issued by the Los Angeles County Superior Court, action was taken on the subject application as to the consistency with the General Plaii, pursuant to the terms and. provisions of ordinance No. 4 (. 1992) of the City of Diamond Bar. (iv) on January 25, 1993, the Planning Commission of the City of Diamond Bar conducted a duly noticed public hearing on the application, continued said hearing to February 8, 1993, and March 8, 1993, concluded said public hearing on April 12, 1993. (v) All legal prerequisites to the adoption of this Resolution have occurred. EIR NO. 91-4/CUP 91-1 B. R_e_s0_1_Ution_ f ound, rmined resolved . NOW, THEREFORE, It ofis the City of deteDiamond Bard as follows:by the Planning Commission This Planning Commission hereby specifically finds that all of the facts set f . orth in the Recitals, Part A, of this Resolution are . true and correct. 2. The Planning commission hereby finds that the initial study prepared and reviewed by the city of Diamond Bar and Environmental impact Report No. 91-4 has been prepared for. this project in compliance with the California Environidelines mental Quality Act Of 1970, as amended, and the Gu promulgated thereunder and further said Environmental Impact prom judgement of the Report No. 91-4 reflects the independent judg City of Diamond Bar. Commission hereby specifically finds and 3. The Planning determines, based on the findings set forth below, that changes and alterations have been.required in or incorporated into and conditioned upon to the proavoidject significant adverse specified in the application, which mitigae o environmental impacts identified in said Environmental Impact effects which areffe Report No. 91-4, except as to those eerriding identified and made the subject of a Statement Of"Ov Considerations which this Planning Commissiofinds otherare clearly Outweighed by the economic, social,n and proposed project, as more fully set forth in benefits of the prc the Statement of overriding ConsiderAtions. 4. The planning ..Commission- hereby adopts the Statement of Overriding Considerations attached hereto as Exhibit "B" and hereby incorporated by reference. 5. The Planning Commission hereby specifically finds and. determines that, after having considered the record as a whole including the findings set forth below, and changes and alternations which have been incorporated into and conditioned upon the proposed project set forth in the application, there is no evidence before this Planning commission that the project proposed have the potential of an adverse effect on wild life resources or the habitat upon which the wildlife depends. I Based upon substantial evidence, this - Planning -commission hereby rebuts the presumption of adverse effects contained in Section 753.5(d) of Title 14 of the California Code of Regulations. Notwithstanding the findings set forth herein, the applicant shall make payment of any and all fees which the Department of Fish and Game may require to be paid prior to the issuance of any building permit or further entitlement. 2 EIR NO. 91-4/CUP 91-1 6. Based on the substantial evidence presented to the Planning Commission during the above -referenced public hearing opened on January 25, 1993, continued to February 8, 1993 and concluded on April 12, 1993, including written and oral staff reports, together with public testimony, And in conformance with Ordinance No. 4 (1992) of the City Diamond Bar, hereby specifically finds as follows: (a) The applicant's request is for approval of a three (3) phase, 425,000 sq. ft.- medical complex to constructed over a 20 year period. The project's development standards and criteria for development are contained within conditions of approval and conceptual architectural and site plans. Each Phase must receive Development Review approval prior to obtaining grading and construction permits. (b) The application applies to property located at 88*7 Grand Avenue, Diamond Bar with a gross area of 43 acres And is zoned C -3 -BE - (Unlimited commercial Zone) and R-4 (Unlimited Residence Zone). The General Plan land use designation is Office Professional Planned Development [PD (OP)]. (c) Properties to the east and south are devel- oped with single family and multi -family residences, to -the north the site is developed with a commercial office, retail commercial and a golf course and the sites to the ,west "are parti4lly developed by a commercial office development known as Gateway Corporate Center. (d) The subject property has previously been graded and currently is a vacant parcel. (e) The site is sufficient in size and can pro- vide adequate ingress and egress to allow the development compatible with the surrounding current land uses. (f) The subject site lies within the Diamond Bar General Plan Office Professional/Planned Development PD (OP) and Open Space (OS) land use designation. The current zoning of the site is not consistent with the land use designation. EIR NO. 91-4/CUP 91-1 3 (g) Notification of the public hearing for this has been made in the San Gabriel Valley Tribune and the Inland Valley - Daily Bulletin newspapers on January 14,1993. Notification to property owners within a 500 foot radius was mailed on February 4, 1993. (h) The design and lay'Out of the proposed devel- opment will not. unreasonably interfere with the use -and enjoyment of the neighboring ex- isting and contemplated future developments, and will not create significant pedestrians, hazards; The conceptual architectural design of 'the proposed complex is compatible with the character of the surrounding development and will maintain the harmonious, orderly, and attractive development contemplated by the Development Review ordinance and the proposed GenerAl Plan of the City; (j) The design of the proposed development would provide a desirable environment for its occu- as well as its pants and visiting public use of neighbors through good aesthetic texture and color that will remain materials, aesthetically appealing and -will retain a reasonably adequate level of.maintenance (k) The proposed use will not be detrimental to the public. health, safety or welfare or be materially injurious to the properties or im- provements in. the vicinity and will promote these goals. (1) The . subject site is adequately "served by Grand Avenue and Golden Springs Drive and all required public and private services. The site is physically suitable for the development. The nature, I condition, and size of the site is adequate in size to accommodate the project. s and conclusions set forth in paragraphs 7. -Based on the finding above, this Planning Commission hereby 1, 2, 3, and 4 a approves the application subject to the following conditions and restrictions. CUP 91-1 EIR NO. 91-4/ . 4 CONDITIONS OF APPROVAL I This permit shall not be effective for any purpose until a duly authorized representative of the owner of the property involved has filed at the office of Planning Division of - the -Community Development Department the Affidavit of Acceptance and accepts all the conditions of this permit; 2. The applicant must comply with all federal, state, Zone C -3 -BE, Community Development Department and Public Works Department requirements, and that all grading, drainage plans and wall plans shall conform to all city standards. 3. The project shall substantially conform to the site plan and architectural elevations as presented to the Planning Commission and dated April 12, 1993. Three copies of the said site plan and elevations as depicted and dated April 12, 1993 and marked collectively as Exhibit "All and conforming to such of the following conditions as can be shown on a plan, shall be submitted for approval of the Community Development Dir. ' ector. All construction materials must comply with the *materials board approved by the Planning Commission and marked as Exhibit "A-111. The. property shall thereafter be developed and maintained in substantial conformance with the approved plans. 4. Approved Uses for the site include the Hospital/Medical Plaza and public and semi-public uses of the conference facilities and limited use of the helipad. as provided herein. I 5. The t ' otal (all phases) net interior square footage of the complex shall not exceed 425,006 square feet and 160 beds. LANDSCAPING 6. The applicant shall submit for approval by the Planning Commission during the Development Review of each phase, landscape and irrigation plans which.shall incorporate drought tolerant landscaping. All landscaping shall be installed prior to issuance of the certificate of occupancy. EIR NO. 91-4/CUP 91-1 5 DESIGN GUIDELINES 7. Roof finish material shall have a uniform goof mounted r6duce reflectiVitY- Addii,roof a equipment must be painted a color to match the . finish material. g. Roof mounted equipment will be hidden behind building parapets so as not to be visible from surrounding streets, drives or adjacent buildings on a horizontal sight line. 9. Where roof mounted equipment is not hidden from residential view by the building parapet, a screen must be constructed using materials complimentary with existing 'buildings in the area. The design of the screen will be integrated into the overall architectural design of the building. The surface of the screen shall be f inished with a color to match the roof . finish material. 10. Private se . curity forces shall be provided as determined by the Sheriff Department to ensure adequat I e protection particularly rticularly of the facility. e disse of all hazadus 11. The hospital shall remmov materials including edicaland waste,poin conformance -rwith local state and federal (OSHA, EPA, etc.) requirements. 12. The location of the helipad shall be approved during the Development Review for each phase subject to approval of The heli ad the Federal Aviation Administration (FAA). Flights are shall be limited to emergency flights only. Fas unless restricted from flying over residential are flying at an altitude in excess of 500 feet, and the pad, lighting to be directed away from sensitive uses. 13. Phase I constructi . on shall not exceed 88,205 net square feet nor use of 20 beds. I shall have a maximum height of 75 ft. and four 14. Phase (4) stories with the tallest portions of the development situated primarily, at the rear elevations and shall step down in height from the rear and center of the complex to the front and side elevations. 15. Phase. I construction shall have a minimum building setback of approximately 300 feet from Grand Avenue and approximately 270 feet from the front property line. 16. All other Phase I project characteristics shall be as EIR NO. 91-4/CUP 91-1 represented on the conceptual plans presented before the Planning commission and marked Exhibit "All as a part of the Development Review. 17. Future Phase II and III as proposed are approved in concept only and in no event shall the proposed buildings--exceed--75feet.-or four (4) stories in height. Additional environmental analysis shall be performed for projects in Phase II and III as may be required by the City. PARKING AND CIRCULATION 18. The applicant shall submit a Transportation System Management Plan for approval - by the Community Development Director, and the Public Works Director prior to Certificate of Occupancy of Phase I in compliance with ordinance No. 1 (1993). 19. The applicant -shall provide the minimum number of parking spaces in accordance with the Phase I plans -approved during Development Review and a detailed plan submitted for approval to the Community Development Director prior to issuance of building lding permits. All parking areas shall be lighted to a I candle foot minimum level of illumination. 20. Parking will be provided within the following ratios: a) The hospital shall be required to provide two parking spaces for each bed. b) outpatient clinics, labora(tories,.. pharmacies and other similar uses shall provide one parking space for each 180 sq. ft. of gross floor area. C) Compact parking stalls (81X161) may be provided at a maximum, not to exceed 30 percent of the total with 70 percent standard size (91x191) spaces. Drive aisles shall be a minimum of 28' feet in' width. The City reserves the right to review the number of compact parking spaces at the time of development. d) Handicapped parking shall be provided at a ratio of one spac . e per 40 and shall be 'located in order to provide access as near as is practical to a primary entrance. e) At least 25 percent of the required parking spaces shall be reserved and marked for the use of employees only. EIR NO. 91-4/CUP 91-1 7 21. Parking lots are to be arranged in a geometric pattern. A 3 foot wide by 4 foot long curbed planter between adjacent stalls at 4 to 6 stall intervals will define the pattern. The tree planters will be centered on the line between the stalls. Additionally, a 5 foot wide curbed planter shall be provided at the end of each parking row. UTILITIES 22. The applicant shall reduce the use of natural gas and electricity and use energy conserving design and materials according to established, standards to be reviewed by the City's Building official. 23. Easements shall be granted to affected public agencies and private utility companies if utilities are not relocated. 24. The applicant shall submit meet and comply with all federal, state, and local regulations. CONSTRUCTION PHASE shall. submit a construction traffic 25. The applicant management plan for approval by the .Director of Public Works prior to issuance of any building permit that will at a minimum*. a) Provide a parking plan for construction related vehicles for each development phase. b) Ensure cons truction-related I traffic will be directed away from residential areas and away from areas -abutting sensitive hospital uses during subsequent phases. 26. The applicant shall reduce construction related emissions of dust by the watering the site at least twice daily sufficient to control dust producing activities especially during the grading stage. 27. The applicant pplicant shall restrict all poise intensive construction activities to the hours of 7 a.m to 5 p.m. Monday through Friday and 8 a.-nz. to 5 p.m. on Saturday. 28. The applicant shall provide noise monitoring equipment on the construction site satisfactory to the community Development Director to monitor the noise level to ensure compliance with the existing noise standards. If EIR NO. 9-1-.4/CUP 91-1 8 .r the noise standards are exceeded the project shall be brought immediately into compliance. The.noise level during the construction phase shall not exceed the level authorized in the noise ordinance for. construction 29. All exterior walls not a part off habitable--- or storage structures shall be.textured. in muted tones and shall . additionally be . covered with ivy or other similar vegetation. 30. The property shall be maintained in a condition which is free of debris both during and 'after the construction, addition, or implementation of the entitlements granted herein. The removal of all trash, debris, and refuse, whether during or subsequent - to construction, shall be done only,by*the property owner, applicant or by a duly permitted waste contractor who has been authorized by the City to. provide collection, transportation, and disposal of solid waste from residential, commercial, construction, and industrial areas within the City. It shall be the applicant's obligation to insure that the waste contractor utilized has obtained permits from the City of Diamond Bar to provide such services. 31.• No signs are approved as a'part of this application. All signs must be submitted to the City under separate application and must comply with all standards in effect at the time of application 32. This grant is valid for two (2) years and must be exercised (i.e. Development Review approval obtained and construction started) within that period or this grant will expire. A one year extension may be requested -in writing and submitted to the City no latter than 30 days prior'to the expiration date. 33. The Mitigation Monitoring Program certified as a part of EIR No. 91-4 shall be implemented and rigorously complied with. Applicant shall deposit and maintain with the city, a fund in such amounts as required by the Director of community Development to defray the,cost of implementation and monitoring by the city staff and consultants retained by the City. 34. All costs related to special consultant services (ie plan check, inspection services, landscApe consultants, etc.) shall be borne by the applicant. 35. The applicant is required to participate in the creation of the Master Plan for the Planned Development areas surrounding the property site. FIR 110. 91-4/CUP 91-1 9 ENGINEERING DEPARTMENT TRAFFIC 36. Developer shall contribute a pre -determined pro rata share towards the design, installation or modification of traffic signal improvements at Grand Avenue and Golden. springs, Grand Avenue and 57 Freeway and other locations per the DEIR as determined in the Development Review application for Phase I. The pro rata share shall be determined by the city Engineer at the time of improvement. toward the applicant shall 37. The apF contribute $109,000, signal at the traffic installation of the existing medical Plaza's entrance designated as entrance No. I prior to issuance of any building permits. Applicant's pro rata share, may be recalculated ased on scre'Cion of future the development, or actual cost, at the dbi City Engineer. Applicant shall also fund 100 percent of any . signal modifications required at this location, P rior. to issuance of any building perm I its. improvements 38. The applicant shall implement all improvenless identified in the EIR during each phase indicated u otherwise noted in these conditions of approval. des 39. The applicant shall provide a themaGr tic to the site from and ign Ave.for the as a entry statement component of the Phase I Development Review application. The entry statement design shall be consistent with the design elements of Gateway Corporate Center. 40. The applicant shall provide access to Golden Springs Dr., shall enter into a reciprocal access agreement with owners, as necessary, and shall the adjacent land access road per city standards to Golden coconstructan the north of the subject Springs Dr. via the property to Development Review site as a part of any. future approvals. is provided to Golden Springs Dr., the 41. When access amount of c applicant shall provide, cash or bonds in the 000 as a condition of approval of the Development $120, of a s construction and installation Review toward ro traffic signal on Golden Springs Dr. Applicant's rata share may be recalculated based on futpure development, and actual cost, at the discretion of the city Engineer. 42. The applicant shall contribute $15,000 the Grand Ave./ Golden springs Ave. mitigation fund for traffic signal 10 EIR NO. 91-4/CUP 91-1 modification. ROAD 43. Applicant shall contribute the predetermined pro rata share toward the street overlay of Grand Avenue and Golden Springs in the amount of $25,000. 44. Pavement striping, marking and street signing shall be installed to the satisfaction of the City Engineer. 45. The applicant shall provide up to 251 of additional right-of-way for street -widening along Grand Avenue as required by the City Engineer as a part the Development Review application. 46. The applicant/ shall repair any broken or damaged curbs, gutters, sidewalk and pavement on Grand Avenue abutting the project. Prior - to any work being perf ormed - in public right-of-way, fees shall be paid and a construction permit shall be obtained from * the City Engineer's office in addition to any other permits .required. 47. The applicant shall.construct base and pavement on all driveways and the fire lanes in accordance with the City approved soils report and City Standards. p_ PROJECT 48. Two copie's of a title report/ guarantee showing all fee owners and interest holders must be submitted prior to approval of the Development Review application. 49. The Developer shall submit to' the City Engineer the total cost estimate of all off-site improvements, prior to approval of the Development Review application. 50. The project shall be annexed to the .Landscape Assessment District 38; and the City-wide lighting district. 51. New centerline ties set as part of this project must be approved by the City Engineer, in accordance with City Standards. 52. Prior to Phase I, if any required public improvements have not been completed by the developer and accepted by the City prior to final approval, the developer shall enter into an inptovement agreement with the City and EIR NO. 91-4/CUP 91-1 11 shall Post the appropriate security in an amount specified by the city Engineer. - 53. All site grading, landscaping, irrigation, street. sewer and storm drain improvement plans improvements; shall be coordinated for consistency Prior to final approval of each phase. 54. on-site driveways and multiple access strips must 'be labeled as "Private Driveway .and Fire -Lane" on the final plans. Fire lanes and private driveways shall be designed in accordance with the Los Angeles County Fire' Code and -must be clearly delineated and dimensioned. Also delineate the proposed driveway/drive approach location to the site. Fire Department approval required prior to final approval of each phase. 55. The detail drawings and notes shown on the submitted plans are conceptual only and the approval of these plansdoesnot constitute approval of these notes. 56. Soil Engineer's, . Geologist's and Grading Engineer's name, address, phone number, signature and stamp must be on the plans. 57. Retaining walls if any to be indicated on plan: -TW (Top p of Wall); TF (Top -of Footing) 58, 3 copies of closure Calculations f or each Lot, Street, Easement must be submitted prior -to final approval. 59. 2 . Copies of the most recent Assessor 'Map Book Covering must be submitted the Site and all adjacent parcels prior to final approval. HYDROLOGY GRADINGGEOLOGY & SOILS 60. Grading of the subject property shall be in accordance with the Uniform Building Code, city Grading ordinance No. 14 (1990) and Hillside Management ordinance No. 7 (1992) or as amended and acceptable grading practices. The final grading plan shall be in substantial conformance with the approved conceptual plan. 61. A detailed soils report based on the proposed project shall be prepared by a qualified engineer licensed by the state of California to perform such work and must be reviewed and approved by the City's Soils Consultants as a part of Phase I the Development Review application. 62. A detailed geological report based on the proposed EIR NO. 91-4/CUP 91-1 12 project prepared by a qualified engineer or geologist shall be submitted at the time of application for grading plan check.. 63. A detailed hydrology report based on the proposed project -prepared by a qualified engineer licensed by the State of California - to perform such work shall be submitted as a component of the Development Review application. The Developer must assume that any storm drain requirements are met for a so year event on site and any downstream system.. 64. Grading and drainage plan (241lx3611) with hydrology studv and hydraulics calculations must be designed in compliance with recommendations of the soils and engineering geology reports. 65. Grading must be signed and stamped by -registered Soils Engineer and registered Geologist. 66. Trees are prohibited within. five feet of the outside diameter of any storm drain pipe measured from the outer edge of a mature, tree trunk. Proposed storm drain to be shown on plans. 67. The following requirements shall be met: a) Surety shall be posted and an agreement executed guaranteei,ng completion of all on-site drainage facilities necessary for dewatering to the satisfaction of the City's Public Works Department prior to the issuance of grading permits. b) Appropriate easements for safe disposal of drainage water that are conducted* onto or over a adjacent parcels, re to be delineated and recorded to the satisfaction of the City's Public Works Department, prior to issuance of grading permits. c) All slope banks in excess of five (5) feet in vertical height. . shall be seeded with native grasses or planted with ground cover for erosion control upon completion of grading or some other alternative method of erosion control shall be completed to the satisfaction of the city Engineer. In addition, a permanent irrigation system shall be provided. 66. completion and stabilization of all man-made slopes, removal of all landslide materials and recons -'%--ruction of slopes must comply with the Los Angeles County Building EIR NO. I 91—A/CUP 91-1 13 Code and ordinances including those requirements for erosion protection and landscaping. SEWER 69. The applicant shall assume financial responsibility for assessing the capacity and condition of sewer and water lines, storm drains, on-site electrical vaults and telephone facilities serving the site and shall pay a pro rata share for any necessary repairs, upgrading and/or relocation required to service this project. Such assessment and repairs, upgrades and/or relocation shall be to the satisfaction' of the Public Works Director. Utilities adjacent to the construction areas shall be placed underground at the expense of the applicant and subject to approval by all pertinent agencies and the Public Works Director. 70. Each building shall be served by a separate sewer lateral. The sanitary sewer system serving the project shall be connected to city sewer system. Said system, shall be.of the size, grade and depth approved by the City Engineer, County Sanitation District -and Los Angeles County Public Works Department*, prior to final approval. Future sewer must be shown on the plans. 71. The Developer must obtain connection permit from the City and County Sanitation District. The project must be annexed into the County Consolidated Sewer Maintenance District and appropriate easements for all sewer main lines must be provided and accepted by the County of Los Angeles Public Works Department, prior to final approval. 72. Developer, at his sole cost and expense, must construct. the sewer system in accordance with the city, Los Angeles County Public Work Department and C . ounty Sanitation District Standards. um-rT -rfP_r'P_Q 73. Provide separate utility services to each building including water, gas, electric power/ telephone, and cable TV (all underground) in accordance with the respective utility Companies standards. Easements shall be provided as r . equired. 74. The developer shall be responsible for the relocation of existing utilities as necessary. EIR NO. 91-4/CUP 91-1 14 75. 'A written certification from Walnut Valley Water District, GTE, SCE, SCG and Jones Intercable stating that adequate facilities are or will be available to serve the proposed project shall be submitted to the City. Such letter must be issued by the utility company at least 90 days prior to final approval of grading plans. 76. The medical facility shall 'develop and implement an Emergency Plan and hospital personnel shall be trained as. a response . component - to local, county and state hazardous/medical waste spill accident response teams. 77. The applicant must apply for and obtain Development Review approval prior to issuance of building permits for any development phase. 8. The Planning commission Secretary shall: (a) Certify to the adoption of this Resolution; and (b) Forthwith transmit a certified copy of this Reso- lution, to Inter -Community Hospital at the address as set forth on the application. APPROVED AND ADOPTED THIS THE 12TH DAY OF APRIL, 1993 BY THE PLANNING COMMISSION OF THE CITY OF DIAMOND BAR. BY� Bruce Flamenbaum, Chairman I, James DeStefano, Planning Commission Secretary, do hereby certify that the foregoing Resolution was duly introduced, passed, and adopted, by the Planning commission on the'12th day of April, 1993 with the following vote: AYES: COMMISSIONERS: Meyer, Li, Grothe, Plunk, and Flamenbaum NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIII: COMMISSIONERS:. ATTEST: aa!mnels DeStef ano, 8ectetary EIR NO. 91-4/CUP 91-1 15 Exhibit _"B" STATE NT OF OVERRIDING CONSIDERATIONS FOR THE PROPOSED DIAMOND. BAR iYiEDICAL PLAZA o. 91 -121 - As concluded in the EIR for the proposed Diamond Bar with Plaza ep n off the potential 027 and CUP 91-1), most environmental impacts, impacts to air qty and traffic, can be mitigated to insignificant levels. The City of Diamond Bar is located within the South Coast Air B is oc s de' d a sionificant timpact and any contribution of pollutant emissions to the basin Also, because of the size of the project, its potential air quality impacts would exceed thresholds" established by the SCAQND. Heavy traffic on Grand Avenue and Golden Springs Road and the SR -57 and SR -60 freeways b be impacted by the proposed project. redu ed by the mitigation measures Increases in vehicle trips to and from the site but traffic volumes on local streets are expected to lead to greater congestion in the area. The City of Diamond Bar, as the Lead Agency and final decision of the proposed p of to the CEQA Guidelines Section 15093, after balancing ct mand traffic, and notwithstanding m against the unavoidable environental effects on air quality the mitigation measures and alternatives described in the Statement of Facts andone ntal for the proposed Diings damond Bar Medical Plaza, determines that the remaining er effects are acceptable due to the following: • There are not enough medical services in the area which could serve the needs of the present and future population of the area. = Construction of the proposed Diamond Bar Medical Plaza will provide the City of Diamond Bar with accessible medical services which would include state-of-the-art facilities and medical technology. The project will present added opportunity for the provision of cost-effective and efficient delivery of health care services to residents of the City and surrounding communities. ■ The Diamond Bar Medical Plaza combines the traditional health care facility with ahotel/recovery center that will provide ambulatory care to better meet et the recent trend the needs of ambulatory patients. This is expected t Dint ventures between towards more hospital-based group practices hospital and physicians. X The project will provide employment opportunities to area residents, as well as improve jobs/housing balance in the City. ■ The project will serve as a revenue source for the City of Diamond Bar. HOSPITAL.RES CONFORMITY REPORT FOR THE DIAMOND BAR MEDICAL PLAZA DIAMOND BAR, CALIFORNIA STATE CLEARING HOUSE NUMBER 91121027 Prepared for: City of Diamond Bar 21660 East Copley Drive, Suite 100 Diamond Bar, California 91765-4177 Prepared by: David Evans and Associates, Inc. 1000 East Garvey Avenue South, Suite 250 West Covina, California 91790 Contact: Marc Blodgett (818) 919-6400 October 13, 1994 4 October 13, 1994 Mr. Rob Searcy, Senior Planner City of Diamond Bar 21660 East Copley Drive, Suite 100 Diamond Bar, California 91765 Dear Mr. Searcy: 4, David Evans and . Associates, Inc. has had an opportunity to review the Phase 1 development proposal for the Diamond Bar Medical Plaza that has been submitted by the Citrus Valley Health Partners to the City. The proposed development is consistent with the development analyzed in the environmental impact report (EIR) that was previously certified by the City Council. This Conformity Report compares the physical characteristics and the resulting environmental impacts of the two Phase 1 development scenarios. The report concludes that for a number of issues, there will be no change in the impacts or the potential impacts will be less (for example, noise and aesthetics) than that anticipated with the previous Phase 1 development scenario. The slightly smaller floor area (approximately 5,205 square feet) of the current Phase 1 development will result in a slight increase in traffic and air quality impacts though the projected increase. is not judged to be significant. The following matrix summarizes the findings of our evaluation (the appendices containing worksheets are referenced). Issue Area Greater No Change Less Impact In Impact Impact Comparison of Impact Land Use_ Traffic/Circulation Earth/Geology Air Quality Water Plant/Animal Lfe NoiseNo Aesthetics Light/Glare Risk of Upset Population/Housing Public Services Utilities Recreation Natural Resources ...........................:.. No change from EIR analysis 137 additional ADT's No change from EIR analysis Slight increase in emissions No change from EIR analysis No change from EIR analysis helicopter noise Less building height & mass No change from EIR analysis No change from EIR analysis 16 fewer employees No change from EIR analysis 7% reduction in useage No change from EIR analysis No change from EIR analysis ,'{ptc<:`:<s '•<: ........... : "`"#1di7E#<>`:>= ''t di E •.`:, '"'�`'''` �' ;::s>::•..•:::?:<: #?•'•,*>F DAVID EVANS ANDASSOCIATES, INC A PROFESSIONAL SERVICES CONSULTING FIRM OFFICES IN OREGON, WASHINGTON, CALIFORNIA AND ARIZONA 1000 E. GARVEY AVENUE, S., SUITE 250 WEST COVINA, CALIFORNIA 91790 (818) 919-6400 FAX (818) 919-6404 U Mr- Searcy October 13, 1994 The Report concludes that the current Phase 1 proposal is consistent with the Phase 1 development analyzed in the EIR prepared for the Diamond Bar Medical Plaza and no further environmental analysis is required at this time. If you have any questions, please do not hesitate to contact me at the West Covina office (818) 919-6400. Sincerely, DAVID EVANS AND ASSOCIATED, INC. Marc Blodgett, Assoc to MTB:kjm cAdbarl.ltr DAMD E\ANSkNDASS0CfATES. INC. ENGINEERS, St *RMURS, PLVNNERS, LV\DSCAPEARCH11'E('FS TABLE OF CONTENTS Page Appendix A - Elevations and Floor Plans Appendix B - Trip Generation Appendix C - Air Quality Impacts Appendix D - Calculation of Employment Appendix E - Utilities Diamond Bar Medical Plaza October 13, 1994 i 1 Project Overview ......................................... Background of the Environmental Review .......................... 1 Appendix A - Elevations and Floor Plans Appendix B - Trip Generation Appendix C - Air Quality Impacts Appendix D - Calculation of Employment Appendix E - Utilities Diamond Bar Medical Plaza October 13, 1994 i 2 Project Description ........................................ Environmental Impacts......................................3 Appendix A - Elevations and Floor Plans Appendix B - Trip Generation Appendix C - Air Quality Impacts Appendix D - Calculation of Employment Appendix E - Utilities Diamond Bar Medical Plaza October 13, 1994 i 12 CONFORMITY ' PROJECT OVERVIEW This report describes the current Diamond Bar Medical Plaza Phase 1 proposal and its consistency with the development analyzed in the Environmental Impact Report (EIR) prepared for proposed medical center (State Clearinghouse No. 91121027). The applicant, Citrus Valley Health Partners, is proposing to initiate development of Phase 1 of the proposed Diamond Bar Medical Plaza. The proposed Phase 1 development will cover approximately 8.2 acres of the project site. The City certified the Final EIR which considered a previous Phase 1 development scenario which differs slightly from that which is currently proposed. This Conformity Report compares the current proposal with that previously analyzed. The Lead Agency, based on this Conformity Report, has determined that the current Phase 1 proposal's environmental impacts will be comparable to or less than that anticipated for the original Phase 1 development. The project site is located on the south side of Grand Avenue, approximately 1,800 feet east of Golden Springs Road, at 887 Grand Avenue, in the City of Diamond Bar. The proposed development will involve the construction of a 425,465 -square -foot medical plaza that will include medical office buildings, acute care- hospital, hospital support, outpatient services, diagnostic and treatment center, and a commnity conference and education center. The City of Diamond Bar, is the Lead Agency for the proposed medical center, as defined by Section 21067 of the California Environmental Quality Act (CEQA) and has the principal responsibility for carrying out or approving the project. The City of Diamond Bar was responsible for the certification of the EIR and for carrying out subsequent environmental- review: --The EIR for the -proposed Diamond -Bar -Medical Plaza was prepared for the City of Diamond Bar in accordance with the California Environmental Quality Act (CEQA) and State CEQA Guidelines, as amended. The purpose of the EIR was to inform the lead agency, responsible agencies, decision- makers, and the general public of the environmental effects anticipated with the construction and operation of the proposed medical center. The Diamond Bar Medical Plaza site is a 43 -acre parcel located on the south side of Grand Avenue, east of Golden Springs Drive. The site is located in the central section of the Diamond Bar, east of the SR-57/SR-60 Freeways and southeast of the Diamond Bar Golf Course. Regional access to the site is provided by the Grand Avenue ramp of the SR-57/SR-60 Freeways. The proposed project site consists of two adjacent lots (referred to as Parcel 2 and Parcel 3) at 887 Grand Avenue; Parcel 2 consists of a graded building pad, west of Parcel 3, which consists of a natural hillside. The shape of the two lots is basically rectangular. Southern boundaries of Parcel 2 are man-made slopes that extend approximately 200 feet westward along the western Diamond Bar Medical Plaza October 13, 1994 1 �i•- —ins -.. .,,SFr �. h.H ....�.- :;_ ,.:'._ ,.J. ._...,.,. .,..:.• .q � _,: - �' Conformity Report (continued) boundary of the site. Parcel 2 elevations range from 814 feet above mean sea level (amsl), at the low point on the graded pad, to 900 feet amsl, midway along the parcel's eastern boundary. Parcel 3 elevations range between 840 to 1,078 feet amsl. Three vacant parcels and a building occupied by Calvary Chapel are located to the west of the proposed project site, at the corner of Grand Avenue and Golden Springs Drive. East of the proposed project site, a multi -family residential development (Montefino Condominiums) is located along the ridgeline overlooking the site. The open, natural hillside on the project site, extends to the south of the site with single family homes located on the ridgeline. Grand Avenue abuts the site's northern boundary. The ridgeline extending north of Grand Avenue is also developed with single family homes. To the west of the ridgeline, north of Grand Avenue a 54 - unit apartment complex is under construction. Further west, at the corner of Grand Avenue and Golden Springs Drive, is a commercial development containing a gas station a restaurant, and a pre-school. Behind this small commercial development is a three-story office building. West of Golden Springs Drive, the Diamond Bar Golf Course extends as a mile -long buffer between the 57/60 Freeways and development to the east. The proposed Diamond Bar Medical Plaza, will be developed in three phases which, at buildout, will consist of a 425,465 square feet. The near-term project phase (Phase 1) is currently being planned at this time and is the subject of this Conformity Report. An interim development phase (Phase 2) will be completed within 5 to 10 years of project implementation. Phase 3 is a _projected expansion of -the facility which _would be constructed at a future date within a 20 -year _ .. time frame as the need for such expansion arises. N Phase 1 was originally planned to consist of a diagnostic and treatment center, a medical office building, and a 20 -bed hotel/recovery center. The applicant.has modified the Phase 1 to include a three floor, 45,000 -square -foot medical office building, and a single floor, 28,000 -square -foot diagnostic treatment center which will contain 14 beds. ® Phase 2 will include a 60 -bed hospital, hospital support facility and a community conference and education center. Phase 3 will consist of a medical office building, diagnostic and treatment center, a 60 -bed hospital, hospital support facilities, and a 20 -bed hotel/recovery center. A helipad originally planned for the complex during Phase 1 has also been eliminated. Vehicle access for the project will continue to be taken from Grand Avenue though a secondary access is anticipated pursuant to the Planning Commission's direction. Diamond Bar Medical Plaza October 13, 1994 2 0, Confomity Report (continued) The current site plan calls for a total of 374 parking spaces, including 10 handicapped stalls. The parking conforms to City code requirements. Current elevations for the proposed Phase 1 development (Diamond Bar Medical Center) are provided in the exhibits included in Appendix A. The structures will range from one to three floors with roof top mechanical equipment confined to a smaller structure on the roof. Floor plans are also provided in Appendix A. MIN Table 1 summarizes those components which originally was planned for Phase 1 (which was the subject of the EIR evaluation) and the Phase 1 development as it is currently proposed. TABLE SUMMARY OF PROJECT CHARACTERISTICS Original Phase 1 24,705-square-footdiagnosdc.and treatment center 40,000 -square -foot medical office building 13,500 -square -foot hotel/recovery center (20 beds) Total floor area - 78,205 square feet Four stories Helipad Current Phase 1 28,000-square-footdiagnos6c treatment center (14 beds) Improvements 45,000 -square -foot medical office building Total floor area - 73,000 square feet Three stories Net Change +3,295 -square -foot increase in diagnostic and treatment center +5,000 -square -foot increase in medical office Helipad will be eliminated -13,500-square-foot hotel/recovery center eliminated As indicated in Table 1, the current Phase 1 proposal is similar to the proposal considered previously. The floor. area of the current proposal is 5,205 square feet less than the Phase 1 development in the EIR with an additional 8,295 square feet. ENVIRONMENTAL IMPACTS The EIR originally prepared for the proposed Diamond Bar Medical Plaza analyzed the project's potential impacts on a wide range of issues including earth and geology, air quality, water and hydrology, plant life, animal life, noise, light and glare, land use, natural resources, risk of upset, population, housing, transportation and circulation, public services, energy, utilities, human health, aesthetics, recreation, natural resources. The current Phase 1 development proposal is less intensive than that previously envisioned by the applicant in terms of building height and mass though its floor area is slightly less (5,205 square feet). As a result, the environmental impacts anticipated to result with the current proposal are likely to be similar to or less than the impacts anticipated with the original Phase 1 development. Table 2 compares the impacts identified in the EIR- for the original Phase 1 development with the anticipated impacts from the current development proposal. Diamond Bar Medical Plaza October 13, 1994 3 I I Conformity Repon (continued) TABLE1. SUMMARY OF i;MPAC"TS I' EIR Phase 1 Development I Current Proposal I Unavoidable Adverse Impacts I) Land Use After adoption of the General Plan, the General Plan land use designations will take precedence over zoning. The proposed project would not require a zone change from the Unlimited Residential (R-4) on Parcel 3, because the proposed project reserves the area for permanent open space, which would be consistent with the R-4 designation. However, the City is currently revising the interim Zoning Ordinance to be consistent with the Draft General Plan and it is likely that the area will be rezoned to reflect the intent of the General Plan land use. Traffic/Circulation Regional access to the proposed project site is provided by the I-60 and 1-57 freeways. Diamond Bar Boulevard and Grand Avenue provide arterial access. The site is currently undeveloped thus, no vehicle trips are generated. The project will generate approximately 10,500 trips per day at buildout. Of this total, 520 trips will be during the - morning peak hour and 805 trips will be generated during the evening peak hour. Phase 1 development was also projected to generate 1,948 trips. The original Phase 1 development was projected to generate 100 morning peak hour trips and 185 evening peak hour trips. Earth and Seismic The on site geotechnical hazard posed by seismic ground shaking is considered to be moderate due to both the proximity of known active and potentially active faults, and to the nature of earth materials underlying the site. The seismic hazard related to soil settlement in Parcel 2 is considered to be slight. Settlement -prone materials such as colluvium and landslide debris create a potential landslide hazard in Parcel 3. Thus, the seismic hazard posed by soil settlement in Parcel 3 is considered to be moderate. As with seismically induced settlement, the potential for ground The current Phase 1 proposal will not result in any additional land use impacts. This land use of the current Phase 1 proposal is consistent with anticipated land use of the earlier Phase 1 development proposal. The current Phase 1 proposal will result in 73,000 square feet of development on 8.2 acres. This development is 5,205 square feet less than that proposed for the previous Phase 1 proposal. The current proposal is projected to generate 2,085 daily trips (an increase of 137 trips over the previous proposal), 71 morning peak hour trips (an increase of 9 trips), and 210 evening peak hour trips (an increase of 25 trips). The increases are slight and will not affect the overall Level of Service (Appendix B indicates traffic generation). _ .___......_ Diamond Bar Medical Pla.a October 13, 1994 4 CEQA and the CEQA Guidelines indicate that a project will have a significant adverse impact on the environment if the proposal is in conflict with adopted environmental plans and goals of the community where it is located. Diamond Bar Medical Plaza will not require a change in the General Plan designation for the project site. The City will initiate a rezoning to ensure conformity between the General Plan and Zoning Ordinance. This rezoning is independent of this proposal and would occur whether or not the project was implemented. In addition, the proposed project will not result in any displacement of existing development. These additional trips resulting from project buildout will adversely impact local streets though the recommended mitigation measures will improve traffic movement in and out of the property. There change in the number of vehicle trips between the two Phase I development scenarios. will not result in. any changes in the roadway level of service (LOS) not already anticipated in the EIR. Conformity Report (continued) TABLE 2 :.: SUMMARY OF IMPACTS EIR Phase 1 Development Current Proposal Unavoidable Adverse Impacts Earth and Seismic (continued) parking areas are the same as that lurching due to seismic shaking is anticipated under the previous Phase 1 considered to be very low for the site. development. The potential geotechnical and geological With the implementation of the impacts of the current development proposed mitigation measures no proposal will be similar to those significant adverse impacts would be anticipated with the previous Phase 1 anticipated. The seismic risk on site is development. The site plan for no greater than that for other areas of the current Phase 1 proposal differs from the Southern California region. The the Phase 1 development analyzed in the analysis indicated a moderate risk from EIR in terms of building placement. The seismic induced slope failure. In lot area that will be developed under the addition, the instability,of temporary current proposal and the placement of trench walls constructed for geotechnical Marginally stable slopes may be subject investigations and utility line placement to landsliding caused by seismic shaking. present a moderate hazard. The risk Several landslides in the graded area of from slope failure must be completely the site were reportedly removed mitigated prior to occupation of the completely during grading operations. proposed hospital. Landslides in natural areas to the east and southwest of the graded area (Parcel 3) could experience reactivation during a seismic event, however. The existing artificial slopes would not be expected to experience failure. The subject site does not lie within an area prone to land withdrawal subsidence from any of these causes. The hazard posed by land subsidence is, therefore, considered to be nil to slight at the subject site. Air Quality Emissions from the project fall into The stationary emissions will be relatively As a result of improving the three major categories: short-term unchanged as compared to the previous subregionaljobs/housing balance, impacts, long-term impacts, and development scenario. The mobile providing needed services closer to the cumulative impacts. emissions for the current proposal will total existing and projected population for the These emissions at buildout exceed the 255 pounds of CO, 27 pounds of ROG, 18 area, and the implementation of SCAQMD recommended thresholds for pounds of NO,, 2 pounds of SO., and 41 mitigation measures, the project will not carbon monoxide, hydrocarbons, ROG, pounds of PM, daily. The projected have a direct or cumulative significant and nitrogen dioxides. Emissions from increase in emissions (shown in Table C in adverse impact on regional or local air Phase 1 development are projected to be the Appendix) projected for Phase I will quality. 25 pounds of CO, 237 pounds of ROG, still be less than the SCAQMD thresholds. 17 pounds of NO., 2 pounds of SO„ and 38 pounds of PM,o. Water The project area and vicinity are within areas of minimal flooding, as designated by the Federal Emergency Management Agency (FEMA). Likewise, the project vicinity is not in a flood hazard area as designated by Flood Insurance Rate Maps (FIRM) or within a floodplain as Diamond Bar Medical Plaza October 13, 1994 5 IConformity Report (continued) il] TABLE 2 SUIBJARY.OF IMPACTS _ 11 EIR Phase i Development ( Current Proposal I Unavoidable Adverse Impacts 11 Water (continued) designated by FEMA. The implemen- tation of the proposed project will involve construction and paving over most of Parcel 2, the graded pad on site. The construction will require undergrounding of the existing open concrete runoff channels. The amount of paving and impervious surfaces will be unchanged under the current Phase i development proposal compared to that considered in the EIR. The impacts for both Phase 1 development scenarios are similar. The proposed project will not result in any adverse impacts on water quality and local hydrology. The rate and velocity of runoff will increase by approximately 10 percent due to the decreased permeability of the site after development. This runoff will be directed into catch basins draining into the underground drainage system. Plant Life/Animal Life/Vector Control Implementation of the proposed project would require only final grading, excavation, and paving of the existing graded building pad. No additional grading of the hillside would be required. No natural vegetation or sensitive " - habitat will be removed from the hillside. The construction and operation of the proposed project, however will increase the level of stress on any remaining animal habitats in the hillside areas. All of Parcel 3 has been reserved for open space as part of this development which is also consistent with the City of Diamond Bar General Plan. This preserved area corresponds to those areas within the property where the remaining natural vegetation is located. As a result, the proposed medical center would have minimal impact on the remnant sage scrub and chaparral vegetation on the hillsides. Noise The proposed project site is subject to ambient exterior noise levels that range from 55 to 65 dBA as borne out by the results of the on site noise measurements. The traffic noise analysis did indicate that Parcel 3 will remain open space under the current Phase 1 development scenario. The potential impacts are the same as those anticipated for the previous Phase 1 development scenario analyzed in the EIR. The Phase 1 development as currently proposed, eliminates the helicopter landing pad. The potential traffic noise impact is comparable to the impacts anticipated for the previous Phase 1 development analyzed in the EIR. Diamond Bar Medical Plaza October 13, 1994 6 As indicated previously the proposal will not directly impact the remaining sage scrub and chaparral communities. In addition, there were no rare or endangeredplant or animal species identified on or near the site. -No significant adverse impacts will result. The project will result in increases in vehicular traffic noise and added noise from ambulance sirens. The Phase 1 development currently under consideration is environmentally superior in that the helipad has been eliminated. Conformity Report (continued) Diamond Bar Medical Plaza October 13, 1994 7 TABLE 2 :; SUMMARY OF IMPACTS EIR Phase I Development Current Proposal Unavoidable Adverse Impacts Noise (continued) traffic noise levels, particularly along Grand Avenue range from 60 dBA to 65 dBA based on existing traffic volumes.The site does generally conform to the exterior noise standards of 65 CNEL as described in the Diamond Bar General Plan. The General Plan) Strategy 1.10.4 in the Plan for Public ' Health and Safety calls for the placement of hospitals in areas subject to 40 to 50 CNEL. Potential significant noise will be generated by helicopter operations. Aesthetics The proposed Diamond Bar Medical The current Phase 1 proposal consists of The current proposal will result in an Plaza would be required to incorporate three floors and, compared to the previous alteration of views though the viewshed design principals similar to those set development proposal, will be less massive impacts are not as significant as those forth in the Diamond Bar Gateway in appearance. The current Phase I anticipated for the previous Phase 1 Center. However, the Medical Plaza proposal's floor area is slightly less than that development. pra, will be visible at certain points where previously considered. there is a break in the foliage. The ,•;> adjacent hillside residential development would also look down onto the proposed Medical Plaza at the north, east and west elevations. The proposed medical complex at buildout will dominate ground level views from throughout the project site. However, the views from the homes at the top of the hills to the south and east of the site will not be 'obstructed by the structures. The proposed structure at its highest point, closest to hills, will be 75 feet above the surface grade. However, the majority of the main structure will be 60 feet high. Light and Glare Traffic, parking lot lighting, and Potential light and glare impacts of the The proposed project will not involve r� interior building lights from the proposed current Phase I proposal will be similar to the use of equipment or building Medical Plaza would create light and those anticipated with the previous Phase 1 materials beyond that typically used in glare impacts on the surrounding areas. development analyzed in the EIR. construction. As a result, no significant The impacts would be greatest from the adverse light and glare impacts with this main entry to the complex. The project are anticipated. proposed project site will utilize lighting in the parking lot, pedestrian and entryway areas for safety. In addition, there will be lighting from the windows in the structure itself. Finally, there will J; be a minimal amount of lighting from the signage identifying entryways and exits as well as signage on the building. The I introduction of a new source of lighting 'eta Diamond Bar Medical Plaza October 13, 1994 7 IConformity Report (continued) - TABLE: I* SUMMARY OF IMPACTS EIR Phase 1 Development Current Proposal Unavoidable Adverse Impacts Light and Glare (continued) within Parcel 2 will result in illumination of those areas that will remain in open space. As a result, some nocturnal animal habitats in Parcel 3 will be affected by the spillover lighting. Risk of Upset/Human Health The proposed medical complex will use The potential impacts associated with the The proposed project is designed to chemicals that could be injurious to current Phase I development will be handle household and commercial waste human health in the absence of any comparable with those anticipated under the and not toxic or hazardous materials. mitigation. The nature and character of previous Phase I development proposal - Given the current regulations at the these chemicals are consistent with that ' considered in the EIR. County, State and Federal levels which expected for this type of development. will regulate the use and disposal of Medical waste will be treated pursuant to hazardous materials, the Lead Agency health requirements governed by County, has determined that the proposed project State and Federal agencies. The will not have an adverse impact on the Environmental Services Department will environment. use a variety of cleaners and materials commonly used' for maintenance. The radiology departments, food service department, pathology department, plant operations department, central services, clinical lab, and nuclear medicine department will all use materials that are classified as hazardous. Population/Housing The proposed project will provide an The current Phase I proposal will generate The proposed Diamond Bar Medical estimated 850 jobs at buildout. These mi.ng 3.03 an estimated 221 jobs, again assuming Plaza project will not result in any additional jobs will improve the jobs per 1,000 square feet. This is 16 fewer significant increase in the local subregion's jobs/housing balance. (The positions over the previous Phase I population through employment subregion is presently jobs poor, housing proposal. generation or result in any displacement. rich.) Phase I development will result in As a result, no adverse significant an estimated 237 jobs (based on 3.03 impacts are anticipated on the local employees per 1,000 square feet. No jobs/housing balanc6. displacement will result from the project's implementation. Public Services The proposed project would place The current Phase I proposal is slightly The proposed project is designed to additional demands on public services. less in floor area and employment provide a medical service to both the The Fire Department indicated fire flows generation. This is likely to result in a existing and anticipated population in the of up to 5,000 gallons per minute at 20 corresponding decrease in public service area. As a result, no significant adverse psi would be required. The Los Angeles impacts. impacts are anticipated. County Sheriff's Department indicated that service can be provided without additional staffing. Some school district impact may result from parents enrolling children in schools near their place of employment. Diamond Bar Medical Plaza October 13, 1994 8 Conformity Report (continued) g' TABLE 2 StA�L41ARY OF MOACT5 11 EIR Phase i Development I Current Proposal ( Unavoidable Adverse Impacts 11 Utilities The project site is well served by utilities and infrastructure. The proposed project could generate up to 124,000 gpd of wastewater, 141,509 gpd of water, 72,500 kWh of electricity daily and 14,000 cubic feet of natural gas every month at buildout. The projected solid waste generation for the proposed medical complex is 2,553 pounds per day. Recreation The proposed project site is a privately owned parcel and not presently used for any sanctioned recreational use. As a result, the proposed medical complex will not represent a loss of open space. available for public recreation use. The open space within Parcel 3 is reserved for wilderness because of the slope constraints and it will not be available for recreational use. Both employees of the Diamond Bar Medical Plaza and visitors to the hospital and hotel/recovery center would utilize the City's available recreational facilities. Natural Resources Development of the proposed project will involve the import of aggregate materials from distant areas. Increased use of fossil fuels will result from the temporary construction activities at the site, including the use of construction vehicles. Development of the proposed project will also permanently increase the consumption of fossil fuels for heating and electricity. The current Phase 1 proposal would decrease utilities usage by approximately 7 percent based on the 7 percent reduction in floor area. Utilities consumption and generation is shown in Appendix E. The open space in Parcel 3 will still be preserved with the current Phase 3 development. The impacts are identical to those anticipated with the Phase I development considered in the EIR. The reduction of the floor area by approximately 5,000 square feet will not result in a significant increase in the consumption of natural resources over that anticipated in the EIR analysis. Diamond Bar Medical Plaza October 13, 1994 9 The infrastructure in the area is adequate to serve this project and any upgrading or retrofitting will be site specific. While the proposed Diamond Bar Medical Plaza development will result in increased electrical consumption, the utility provisions will be able to adequately serve the site. According to CEQA and the CEQA Guidelines, a project will have a significant adverse impact if it involves a reduction in the amount of public open space or if it represents a significant constraint in the use of this open space. No significant adverse impacts will result. According to CEQA and the CEQA Guidelines, a project will have a significant adverse impact on the environment if it involves wasteful or excessive consumption of non-renewable resources. The proposed medical complex does not meet this criteria. APPENDIX A - ELEVATIONS AND FLOOR AREA PLANS Current Phase I Development Proposal East Elevation Site Plan Elevations/Site Sections First Level Floor Plan - Hotel/Recover'y First Level Floor Plan - Medical Office Second Level Floor Plan - Medical Office FA Third Level Floor Plan - Medical Office Previous Phase I Development Analyzed in EIR Planning Phase Site Plan Exhibit 10 - Elevations Diamond Bar Medical Plaza October 13, 1994 10 aT -PT. E E- IM11 I 0. E. E 91 E .. ILET :EI aT -PT. E E- M11-101.1 n I IM11 I E. E 91 E .. ILET :EI 03 --.El lomm. MM low X M11-101.1 n I E. E 91 E .. ILET :EI 03 --.El M11-101.1 n I 0 Oxon" L Phase I Phase 2 Phase 3 MAGNOSTIC�� AND TREATMENTA4 SOURCE I-ce, Burkhart, Liu, Inc. (-NORTH 0 2W S=10 in lest SOURCE- Lze, Burkhart, Liu, Inc. r; APPENDIX B - TRIP GENERATION The Table below indicates the trip generation anticipated with the current Phase I proposal with the development scenario evaluated in the previous EIR. Diamond Bar Medical Plaza October 13, 1994 PROJECTED TRIP, GENERATION Previous Current. Project Component Change AM PM ADT AM PM ADT Diagnostic Treatment Center +13% 30 39 588 34 45 670 Medical Office+13% 62 138 1,252 71 165 1,415 Hotel Recovery C . enter -30% 8 8 108 0 0 0 Total 100 185 1,948 105 210 2,085 AM - Morning peak hour trips PM - Evening peak hour trips ADT - Average daily traffic Diamond Bar Medical Plaza October 13, 1994 C� •` AppENDrK C AIR QUALM EvIPACTS The Table below projects the emissions anticipated with the current Phase I Development proposal with the development scenario evaluated in the Diamond Bar Medical Plaza EIR. Diamond Bar Medical Plaza October 13, 1994 12 TABLE B -AM QUALITY IMPACTS Mobile Emissions ml'lbs/day) CO ROG NO, sox VM10 Previous Phase I Development 237 25 17 2 38 Current Phase I Development 255 27 18 2 41 Net Change Between Previous & Current Phase I Development 18 1 1 negl. 3 SCAQMD Threshold 550 55 55 150 150 CO - Carbon Monoxide, ROG - Reactive Organic Gases, NO, - Nitrogen Dioxide, SO, - Sulfur Oxides, 10 - Particulates Diamond Bar Medical Plaza October 13, 1994 12 APPENDIX - CALCULATION OF EMPLOYMENT Generation Factor: 3.03 employees/1,000-square-foot of floor area Previous Phase 1 Development Considered in EIR: 78,205 -square -foot floor area 78.205 X 3.03 = 237 employees Current Phase 1 Development: 73,000 -square -foot floor area 73.0 X 3.03 = 221 employees Net Change = 16 employees Diamond Bar Medical Plaza October 13, 1994 13 D W Project Buildout in EIR Phase 1 in EIR Current Phase 1 Net Change Natural Gas: 70,911 cu.ft./day 13,034 cu.ft./day 12,167 cu.ft./day -867 cu.ft./day Electrical: 19,933 kWh/day 3,664 kWh/day 3,420 cu.ft./day -244 cu.ft./day Water: 141,509 gals/day 26,011 gals/day 24,280 gals/day -1,731 gals/day Sewer: 108,040 19,859 gals/day 18,537 gals/day 1,322 gals/day Solid Waste: 2,553 lbs/day 469 lbs/day 521 lbs/day -38 lbs/day Diamond Bar Medical Plaza October 13, 1994 14 Plans found in project file. I File r v �e byL� on and is ready for destruction by City Clark