Loading...
HomeMy WebLinkAboutRES 91-53RESOLUTION NO. 91-53 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DIAMOND BAR AMENDING THE CITY PUBLIC WORKS STANDARDS FOR TRENCH REPAVEMENT SECTIONS. A. Recitals. ' (i) The City of Diamond Bar has heretofore adopted standards for public works construction which standards require amendment from time to time to reflect new techniques for public works construction. (ii) The City Engineer has prepared and provided to this Council a report pertaining to upgraded standards for trench repavement sections within City streets. -- (iii) The City Council desires to amend the City public work standards by the adoption of a new trench repavement standard. (iv) All legal prerequisites to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, the City Council of the City of Diamond Bar does hereby find, determine and resolve as follows: 1. In all respects as set forth in the Recitals, Part A, of this Resolution. 2. The City Council hereby adopts, as a portion of the City's Public Works Construction Standards, a new Standard No. 91-1, Trench Repavement Section Standard, as set forth in 1 Exhibit "A" attached hereto and by this reference incorporated herein. 3. The City Clerk shall certify to the adoption of this Resolution. PASSED, ADOPTED AND APPROVED this 2nd day of July, 1991. Mayor I, LYNDA BURGESS, City Clerk of the City of Diamond Bar, do hereby certify that the foregoing Resolution was passed, — adopted and approved at a regular meeting of the City Council of the City of Diamond Bar held on the 2nd day of July, 1991, by the following vote: AYES: COUNCIL MEMBERS: Nardella, Papen, Mayor Pro Tem Kim, Mayor Forbing NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: Werner ABSTAINED: COUNCIL MEMBERS: None ATTEST: City lerk of Otho , y of Diamond Bar C�10111PNRESM DB 5.1 2 NOTE 1. Pavement replacement section shall be as shown on the approved improvement plan. Minimum section shall be 3" A.C. or existing pavement thickness plus 1", whichever is greater on 6" aggregate base. Existing Pavement Asphalt Concrete Overlay (See Note 2) NOTE 2 Asphalt concrete overlay shall be at least 60 but not more than 120 calendar days after trench paving. Overlay dimensions shall be as follows: A. Thickness — 1" maximum B. Width — Five times trench width or ten feet, whichever is greater. Trench Paving (See Note 1) o• R .4P. e p' . 42645 ITY ENGINEER R.C.E. LED WITH QTY CLERK DATE: DW@. NO. ST - of I Base Material(See Note 1) Compacted backfill as per Section 306-1.3.6 of the Standard Specifications for Public Works Construction Trench CITY OF DIAMOND BAR a Office of The Cty Engineer ENCH REPAVEMENTSECTION EXHIBIT "A"