HomeMy WebLinkAboutRES 91-37RESOLUTION NO. 91 -37-
A
1 -37-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DIAMOND BAR, CALIFORNIA,
REQUESTING THE BOARD OF SUPERVISORS OF THE LOS ANGELES COUNTY FLOOD
CONTROL DISTRICT OF THE STATE OF CALIFORNIA TO ACCEPT ON BEHALF OF SAID
DISTRICT A TRANSFER AND CONVEYANCE OF STORM DRAIN IMPROVEMENTS
KNOWN AS PRIVATE DRAIN NO. 1668 UNIT 11 IN THE CITY OF DIAMOND BAR FOR
FUTURE OPERATION, MAINTENANCE, REPAIR AND IMPROVEMENT, AND AUTHORIZE
THE TRANSFER AND CONVEYANCE THEREOF.
WHEREAS, there have been dedicated to, or the City has otherwise acquired, the storm
drain improvements and drainage system known as PRIVATE DRAIN NO. 1668 Unit II, described
in Exhibit A attached hereto; and
WHEREAS, the City is authorized and empowered to transfer and convey to the Los
Angeles County Flood Control District any storm drain improvements and drainage systems for
future operations, maintenance, repair and improvement; and
WHEREAS, the City and the Los Angeles County Flood Control District entered into an
agreement dated June 20,1989, and recorded March 20,1990, as Document Number 90-545570,
of the Official Records in the office of the County Recorder for the County of Los Angeles,
whereby the City made certain warranties about its future transfers and conveyances of Flood
Control facilities to the District; and
WHEREAS, the best public interest will be served by transfer and conveyance of the storm
drain improvements and drainage systehi described in Exhibit A attached hereto from the City
to the Los Angeles County Flood Control District for future operation, maintenance, repair and
improvement.
NOW, THEREFORE, BE IT RESOLVED that the City does hereby request the Los Angeles
County Flood Control District to accept the transfer and conveyance of the storm drain
improvements and drainage system described in said Exhibit A.
BE IT FURTHER RESOLVED that, subject to the acceptance thereof of the Board of
Supervisors of the Los Angeles County Flood Control District, the City Engineer is directed and
Contractor will meet with representatives of
Foothill Transit, the Southern California Rapid
Transit District, Los Angeles County Transportation
Commission and the Pomona Valley Transportation
Authority as needed to insure that the recommended
service does not duplicate, existing public
transportation services and enhances mobility for
the citizens of the City. Contractor will also
work with the 'above agencies to secure transfer
agreements as necessary.
5.2 Phase 1 Reports
As part of the Contractors responsibilities under Phase 1, the
Contractor will be required to produce two formal reports. A draft
report containing the various recommendations required to implement
the operations will be required within forty-five days after the
execution of the contract between the City and the Contractor.
After receiving direction from City staff and Committees, the
Contractor will prepare a final report within 20 days of receiving
direction from the City. The Contractor will be required to
provide at least one formal presentation on both the draft and
final report.
Phase 1 will be considered complete upon formal acceptance of the
final report by the City. No payments will be made for Phase 1
work until the final work is accepted. Acceptance of the work is
entirely at the discretion of the City. The City shall retain the
right to request expansion on or additional information on any
section of the reports.
f 5.3 Phase 2 - Operations
Upon final approval of Phase 1, the Contractor shall have 45 days
to implement the transit system approved by the City as part of the
Contractor's final report. The various details of the operation,
including hours of service, number of vehicles, total service
levels, etc. are subject to change and refinement during Phase 1.
It is expected that the Contractor will initiate operations start-
up activities concurrently with the performance of work under Phase
1, as the various operational policy decisions are made by the
City. The Scope of Work for the operations of the FRD transit
system is hereafter presented to allow Contractors to present a
reasonable proposal. The quantity and quality of services
described herein should be used by the Contractor as the basis of
the work completed under Phase 1, but can change upon approved
recommendations of the Contractor or direction by the City.
Contractors must utilize the levels of service described to prepare
their price proposals. The rate structure payable to the
Contractor has been designed to allow flexibility in the provision
of alternate service levels.
28
ordered to prepare all necessary instruments and documents, including deed, to effectuate said
transfer and conveyance, and that the Mayor is authorized and instructed to execute said deed
and other instruments and documents. District shall have no obligation or responsibility to
maintain said storm drain, improvements, and drainage until all rights of way for said drain now
vested in the City and all other necessary rights of way therefore have been conveyed to and
accepted by District.
Reference is hereby made to District Drawings No. 313-F80.1-80.2, the plans and profile
of said storm drain improvements and drainage system on file in the office of the City Engineer
and on file of the Chief Engineer of said District for further data as to the exact location, extent,
and description of said storm drain improvements and drainage system.
i
BE IT FURTHER RESOLVED that the transfer and conveyance hereby requested are
subject to each of the warranties described in the Agreement between the City and the District
dated June 20, 1989, and recorded March 20, 1990, as Document Number 90-545570, of the
Official Records in the office of the County Recorder for the County of Los Angeles. Such
warranties by the City are incorporated here by this reference.
n
The City Clerk shall certify to the adoption of this Resolution.
PASSED, APPROVED AND ADOPTED this 4 t h day of June ,1991.
MAYOR
ATTEST:
CITY CLERK
[ I, LYNDA BURGESS, City Clerk of the City of Diamond Bar, do hereby certify that the foregoing
Resolution was passed, approved and adopted at a regular meeting of the City Council of the
City of Diamond Bar held on 4th day of June , 1991, by the following
vote:
AYES: COUNCIL MEMBERS: Werner, Nardella, Papen,
Mayor Pro Tem Kim and Mayor Forbing
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
ABSTAINED: COUNCIL MEMBERS: None
LYNDA BURGES , City Clerk
City of Diamond Bar
db-cc3:drl668 Unit Il.res
EXHIBIT °A"
Private Drain 1668 Unit II
A reinforced concrete pipe storm drain system and appurtenant structures for Tract Map No.
41305 filed in Book 989, pages 4 to 8; inclusive, of Maps, Records of the County of Los Angeles,
generally described as follows:
Line "A":
Commencing from an existing storm drain per P.D. No. 1668 Unit I, Station 0+00.00 located in
Montefino Drive, Westerly of Diamond Bar Boulevard; thence northeasterly in Montefino Drive to
a 10 -foot -wide easement for storm drain and storm drain ingress and egress purposes, which lies
within Lot 1 of said tract; thence northeasterly in said easement to a catch basin, Station
1 +90.88, a distance of 191 feet, more or less.
All as shown on District Drawing Nos. 313-F80.1 through 313-F80.2
W.
GRAND AVENUE
r cN.« •L—L'hL Il�r
m-
`L-AiERAL L
.. � 1 • <wNr�w.ar7.1 �
`v) LIP
A d. III,r
. r • \air " �1"s I�pR+'f
�• ;'ac. ... p• 1'1\IVATC crzN
PU`G I.ANr
� LA7-CRAL H'. � a s••'.J ••±•
U at :.r o2c
i t Jo p•,h
-Jill-
NOT
:li-NOT IO GI' MAI/rTAWF.p •• . ' qN
J 4
rIF.Ci
7�
(SEl GlPO. /•LANJ .S i'�1�� \ '��'�.j,'.I..r.0 �ry LATERA
, K.r•1� VT 1»•Nyc � \` '• `� .rr::ha y? (.r1Tt=I:/�(c'n
i1/• ,/a•. /•1•IA•T K�„ ���\��% // '•.\ ti l�•r•r• IY•..IT
I L'J. '. i<'1-Ma,-•l•/VN.1 •ilA �. fit•\l/� � • ` I•� 1G4t3.1N.71 �1
ry r.a •:mss . rlt'+;;C�- �t O/�SJ[T/Nd • • `•�\�1r'r r• r, x.w�r�nwr
£!-I.N:./. 11.1'n' V � /a•.s•S I.V
/-r
- • Sr t..r ���-Ia-r�CTy~ ++.a- •'.r • ..
rM.r•1 1•�I't
la c-ArERAL -fA"'
4:
/�S//,T/Nf
,S Alx 0-1
NOT TOM MNINT/\,Nf3[V , (3l'C
oY tncwc.v 1
CITY* O.FDIAMOND BAR
PRIVATE DRAIN NO. 1668
TRACT N0.'4/30-5'
gate -a
TO: Don Wolfe
Land Developntmt Division
PROM: Kahler V. Russel
Construction Division
ATrMrION: Rod Kubocrmto
NOTICE OF MIPLETION - PRIVATE DRAIN
TR/PZr-'NL)MM = r=1-+� ._ PROJECT
` JOB NUMBER f_ /��i � LOCATION
Final Inspection of the above -captioned Private Drain has been made. The work
has been cornpl.eted in accordance with the plans and specifications, and is
ready for fornal acceptance. _
Inspection Date /p-?-7-Aq By %� �r-��_jo7r/ , Underground Inspection Section
Approval Date f- /44 -S7_ By..� Head Construction Inspector
R04M�YZ (711
This Job Number should be closed.
Receayrend this Job be accepted for public use.
f
SUpervisor,� Cot ct nstruc i n
Approved By
d ivisio pection
cc: Hdgtrs/Permit Office/Road Element
F ad Construction Inspector
i1e
CR:51/CJDMP-PD
Revised 4/89
0