Loading...
HomeMy WebLinkAboutRES 99-69RESOLUTION NO. 99- 69 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DIAMOND BAR, CALIFORNIA FINDING THE CITY OF DIAMOND BAR TO BE IN CONFORMANCE WITH THE CONGESTION MANAGEMENT PROGRAM (CMP) AND ADOPTING THE CMP LOCAL IMPLEMENTATION REPORT, IN ACCORDANCE WITH CALIFORNIA GOVERNMENT CODE SECTION 65089 A. RECITALS. (i) The Los Angeles County Metropolitan Transportation Authority ("MTA"), acting as the Congestion Management Agency for Los Angeles County, adopted the 1997 Congestion Management Program in November 1997; and (ii) The adopted CMP requires that MTA annually determine that the County and cities within the County are conforming to all CMP requirements; and (iii) The adopted CMP requires submittal to the MTA of the CMP local implementation report by September 1, 1999; and — (iv) The City Council of the City of Diamond Bar held a noticed public hearing on August 17, 1999. B. RESOLUTION. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DIAMOND BAR DOES HEREBY RESOLVE AS FOLLOWS: Section 1. That the City Council has taken all of the following actions, and that the City of Diamond Bar is in conformance with all applicable requirements of the 1997 CMP. By June 15, 2001, the City of Diamond Bar will conduct annual traffic counts and calculated levels of service for selected arterial intersections, consistent with the requirements identified in the CMP Highway and Roadway System Chapter. The City of Diamond Bar has locally adopted and continues to implement a transportation demand management ordinance, consistent with the minimum requirements identified in the CMP Transportation Demand Management Chapter. The City of Diamond Bar has locally adopted and continues to implement a land use analysis program, consistent with the minimum requirements identified in the CMP Land Use Analysis Program Chap*er. -1- The City of Diamond Bar has adopted a Local Implementation Report, attached hereto and made a part hereof, consistent with the requirements identified in the CMP. This report balances traffic congestion impacts due to growth within the City of Diamond Bar with transportation improvements, and demonstrates that the City of Diamond Bar is meeting its responsibilities under the County -wide Deficiency Plan. SECTION 2. That the City Clerk shall certify to the adoption of this Resolution and shall forward a copy of this Resolution to the Los Angeles County Metropolitan Transportation Authority. PASSED, APPROVED and ADOPTED this 17thday of August '1999. MAYOR I, LYNDA BURGESS, City Clerk of the City of Diamond Bar, do hereby certify that the foregoing Resolution was passed, adopted and approved at a regular meeting of the City Council of the City of Diamond Bar held on 17-lday of August , 1999 by the following vote: AYES: COUNCILMEMBERS: Ansari, Herrera, Huff, MPT/O'Connor, M/Chang NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAINED: COUNCIL MEMBERS: None ATTEST: ( "-- '-16 - City Clerk, City.af Diamond Bar -2- 99-69 Local Implementation Report DEFICIENCY PLAN STATUS SUMMARY REPORTING PERIOD: JUNE 1, 1998 - MAY 31,1999 1. Total Current Congestion Mitigation Goal (-) 4,249 2. Transportation Improvement Credit Claims (+) 306 Subtotal Current Credit (-) 3,943 3. Carryover Credit from Last Year's Local (+) Implementation Report 67,300 FNET DEFICIENCY PLAN BALANCE (_) 63,357 The Planning Center City of Diamond Bar Reporting Period.- June 1, 1998 - May 31, 1999 99-69 Local Implementation Report NEW DEVELOPMENT ADJUSTMENTS RESIDENTIAL DEVELOPMENT ACTIVITY Category Number of Dwelling Units Impact Sub -total Value Single Family Multi -Family Group uarters x 6.80 = x 4.76 = x 1.98 = COMMERCIAL DEVELOPMENT ACTIVITY Category Thousands of Gross Square Feet Value per Sub -total 1000 sq. ft. Commercial 0-299 KSF Commercial 300+ KSF Free Standing Eating and Drinking x 22.23 = x 17.80 = x 66.99 = NON -RETAIL DEVELOPMENT ACTIVITY Category Thousands of Gross Square Feet Value per Sub -total 1000 sq. ft. Lodging Industrial Office 0-49 KSF Office 50-299 KSF Office 300 + KSF Medical Government InstitutionallEducation University x 7.21 = x 6.08 = x 16.16 = x 10.50 = x 7.35 = x 16.90 = x 20.95 — x 7.68 = x 1.66 = Per Student Other (Describe) Daily Trips Impact Sub -total Value x 0.71 = 0 The Planning Center City of Diamond Bar Reporting Period: June 1, 1998 - May 31, 1999 __ Q -Q-A Q_..-_ Local Implementation Report NEW DEVELOPMENT ACTIVITY RESIDENTIAL DEVELOPMENT ACTIVITY Category Number of Dwelling Units Impact Sub -total Value Single Family Multi -Family Group Quarters x 6.80 = x 4.76 = x 1.98 = COMMERCIAL DEVELOPMENT ACTIVITY Category Thousands of Gross Square Feet Value per Sub -total 1000 sq. ft. Commercial 0-299 KSF Commercial 300+ KSF Free Standing Eating and Drinking 50.03 x 22.23 = 1,112 x 17.80 = x 66.99 = NON -RETAIL DEVELOPMENT ACTIVITY Category Thousands of Gross Square Feet Value per Sub -total 1000 sq. ft. Lodging Industrial Office 0-49 KSF Office 50-299 KSF Office 300 + KSF Medical Government Institutional/Education University x 7.21 = x 6.08 = x 16.16 = 339 x 10.50 — x 7.35 = 2,798 x 16.90 = x 20.95 = x 7.68 = x 1.66 = 20.95 380.70 Per Student Other (Describe) Daily Trips Impact Sub -total Value x 0.71 ADJUSTMENTS (OPTIONAL) - Complete Part 2 = +0 TOTAL CURRENT CONGESTION MITIGATION GOAL (POINTS) = 4,249 11 The Planning Center City of Diamond Bar Reporting Period., June 1, 1998 - May 31, 1999 Local Implementation Report CMP TDM Ordinance 1. Project Number 1. Project Number 2. Strategy 331. Transit Fare Subsidv Program 1 306. CMP TDM Ordinance 3. Project Description between 6/1/97 and 5/31/98 to 431 per month sold between 6/1/98 and 5/31/99. Senior/disabled pass sales have increased from 62 per month between 6/1/97 and 5/31/98 to 87 per month between 6/1/98 451,672 sq.ft. were conditioned by the City's TDM Ordinance. Available upon request. 3a. Reference Documentation 5. Credit Factor 6. Project Credit Value Available upon request. 0.2/100 passes (general) <1 4. Project Scope (Units) 5. Credit Factor 6. Project Credit Value 451,672 s . . 0.30 per 1,000 s . . 136 7. Expected Completion Date 8. Project Cost 9. Local Participation (%) Complete Developer Funded 100% 10. Current Milestone 11. Milestone Factor 12. Net Current Value 3 100% 136 Transit Fare Subsidies 1. Project Number 2. Strategy 2 331. Transit Fare Subsidv Program 3. Project Description The City subsidizes transit passes at 20% and 50% discount for the general public and seniors/handicapped, respectively. General pass sales have increased from 411 per month sold between 6/1/97 and 5/31/98 to 431 per month sold between 6/1/98 and 5/31/99. Senior/disabled pass sales have increased from 62 per month between 6/1/97 and 5/31/98 to 87 per month between 6/1/98 and 5/31/99. 3a. Reference Documentation Available upon request. 4. Project Scope (Units) 5. Credit Factor 6. Project Credit Value 20 passes/month (general) 0.2/100 passes (general) <1 25 asses/month (sen/dis) 37/100 passes (sen/dis) 9 7. Expected Completion Date 8. Project Cost 9. Local Participation (%) current Prop A 100% 10. Current Milestone 11. Milestone Factor 12. Net Current Value 1 3 100% 9 The Planning Center City o/ Diamond Bar Repotting Period: June 1, 1998 - May 31, 1999 99-69 Local Implementation Report Signal Synchronization 1. Project Number 1. Project Number 2. Strategy 246 Park & Ride Facilitv 2 241.5 Signal Svnchronization 3. Project Description space facility an additional 125 spaces are being constructed. Partial credit claimed for earlier milestones. Completion of Counry signal synchronization project. Diamond Bar Blvd (Route 57/LA County Line). Partial credit received or Milestone 2 in 97/98 Report. Credit amount determined by Countv. 3a. Reference Documentation 5. Credit Factor 6. Project Credit Value Thomas Guide Page #680 A2 9.6 credits/space 1,200 4. Project Scope (Units) 5. Credit Factor 6. Project Credit Value July 1998 Credit determined by 33% 10. Current Milestone County in 97/98 report 11,760 7. Expected Completion Date 8. Project Cost 9. Local Participation (%) Completed -- 10% local share 1.2% city share 10. Current Milestone 11. Milestone Factor 1 12. Net Current Value 1 3 30% 42 Park -n -Ride Expansion 1. Project Number 2. Strategy 3 246 Park & Ride Facilitv 3. Project Description The City, in coordination with the State of California, is in the construction phase of expanding the Diamond Bar Blvd @ 60 Freeway park -n -ride facility. Based on the high usage of the existing 260 space facility an additional 125 spaces are being constructed. Partial credit claimed for earlier milestones. 3a. Reference Documentation Thomas Guide Page #640 B7 4. Project Scope (Units) 5. Credit Factor 6. Project Credit Value 125 spaces 9.6 credits/space 1,200 7. Expected Completion Date 8. Project Cost 9. Local Participation (%) July 1998 $214,000 33% 10. Current Milestone 11. Milestone Factor12. Net Current Value 3 30% 119 R Coln-0RCALLIR.999 The Planning Center City of Diamond Bar Repotting Period: June 1, 1998 - May 31, 1999 99-69