HomeMy WebLinkAboutRES 99-69RESOLUTION NO. 99- 69
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DIAMOND
BAR, CALIFORNIA FINDING THE CITY OF DIAMOND BAR TO BE IN
CONFORMANCE WITH THE CONGESTION MANAGEMENT PROGRAM
(CMP) AND ADOPTING THE CMP LOCAL IMPLEMENTATION REPORT,
IN ACCORDANCE WITH CALIFORNIA GOVERNMENT CODE SECTION
65089
A. RECITALS.
(i) The Los Angeles County Metropolitan Transportation Authority
("MTA"), acting as the Congestion Management Agency for Los Angeles County, adopted the
1997 Congestion Management Program in November 1997; and
(ii) The adopted CMP requires that MTA annually determine that the
County and cities within the County are conforming to all CMP requirements; and
(iii) The adopted CMP requires submittal to the MTA of the CMP local
implementation report by September 1, 1999; and
— (iv) The City Council of the City of Diamond Bar held a noticed public
hearing on August 17, 1999.
B. RESOLUTION.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DIAMOND BAR
DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. That the City Council has taken all of the following actions, and that the
City of Diamond Bar is in conformance with all applicable requirements of the 1997 CMP.
By June 15, 2001, the City of Diamond Bar will conduct annual traffic counts and
calculated levels of service for selected arterial intersections, consistent with the requirements
identified in the CMP Highway and Roadway System Chapter.
The City of Diamond Bar has locally adopted and continues to implement a
transportation demand management ordinance, consistent with the minimum requirements
identified in the CMP Transportation Demand Management Chapter.
The City of Diamond Bar has locally adopted and continues to implement a land use
analysis program, consistent with the minimum requirements identified in the CMP Land Use
Analysis Program Chap*er.
-1-
The City of Diamond Bar has adopted a Local Implementation Report, attached hereto
and made a part hereof, consistent with the requirements identified in the CMP. This report
balances traffic congestion impacts due to growth within the City of Diamond Bar with
transportation improvements, and demonstrates that the City of Diamond Bar is meeting its
responsibilities under the County -wide Deficiency Plan.
SECTION 2. That the City Clerk shall certify to the adoption of this Resolution and
shall forward a copy of this Resolution to the Los Angeles County Metropolitan
Transportation Authority.
PASSED, APPROVED and ADOPTED this 17thday of August '1999.
MAYOR
I, LYNDA BURGESS, City Clerk of the City of Diamond Bar, do hereby certify that
the foregoing Resolution was passed, adopted and approved at a regular meeting of the City
Council of the City of Diamond Bar held on 17-lday of August , 1999 by the
following vote:
AYES: COUNCILMEMBERS: Ansari, Herrera, Huff,
MPT/O'Connor, M/Chang
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
ABSTAINED: COUNCIL MEMBERS: None
ATTEST: ( "-- '-16 -
City Clerk, City.af Diamond Bar
-2-
99-69
Local Implementation Report
DEFICIENCY PLAN STATUS SUMMARY
REPORTING PERIOD: JUNE 1, 1998 - MAY 31,1999
1. Total Current Congestion Mitigation Goal (-)
4,249
2. Transportation Improvement Credit Claims (+)
306
Subtotal Current Credit (-)
3,943
3. Carryover Credit from Last Year's Local (+)
Implementation Report
67,300
FNET DEFICIENCY PLAN BALANCE (_)
63,357
The Planning Center City of Diamond Bar
Reporting Period.- June 1, 1998 - May 31, 1999
99-69
Local Implementation Report
NEW DEVELOPMENT ADJUSTMENTS
RESIDENTIAL DEVELOPMENT ACTIVITY
Category
Number of Dwelling Units
Impact Sub -total
Value
Single Family
Multi -Family
Group uarters
x 6.80 =
x 4.76 =
x 1.98 =
COMMERCIAL DEVELOPMENT ACTIVITY
Category
Thousands of
Gross Square Feet
Value per Sub -total
1000 sq. ft.
Commercial 0-299 KSF
Commercial 300+ KSF
Free Standing
Eating and Drinking
x 22.23 =
x 17.80 =
x 66.99 =
NON -RETAIL DEVELOPMENT
ACTIVITY
Category
Thousands of
Gross Square Feet
Value per Sub -total
1000 sq. ft.
Lodging
Industrial
Office 0-49 KSF
Office 50-299 KSF
Office 300 + KSF
Medical
Government
InstitutionallEducation
University
x 7.21 =
x 6.08 =
x 16.16 =
x 10.50 =
x 7.35 =
x 16.90 =
x 20.95 —
x 7.68 =
x 1.66 =
Per Student
Other (Describe)
Daily Trips
Impact Sub -total
Value
x 0.71 =
0
The Planning Center City of Diamond Bar
Reporting Period: June 1, 1998 - May 31, 1999
__ Q -Q-A Q_..-_
Local Implementation Report
NEW DEVELOPMENT ACTIVITY
RESIDENTIAL DEVELOPMENT ACTIVITY
Category
Number of Dwelling Units
Impact Sub -total
Value
Single Family
Multi -Family
Group Quarters
x 6.80 =
x 4.76 =
x 1.98 =
COMMERCIAL DEVELOPMENT ACTIVITY
Category
Thousands of
Gross Square Feet
Value per Sub -total
1000 sq. ft.
Commercial 0-299 KSF
Commercial 300+ KSF
Free Standing
Eating and Drinking
50.03
x 22.23 = 1,112
x 17.80 =
x 66.99 =
NON -RETAIL DEVELOPMENT
ACTIVITY
Category
Thousands of
Gross Square Feet
Value per Sub -total
1000 sq. ft.
Lodging
Industrial
Office 0-49 KSF
Office 50-299 KSF
Office 300 + KSF
Medical
Government
Institutional/Education
University
x 7.21 =
x 6.08 =
x 16.16 = 339
x 10.50 —
x 7.35 = 2,798
x 16.90 =
x 20.95 =
x 7.68 =
x 1.66 =
20.95
380.70
Per Student
Other (Describe)
Daily Trips
Impact Sub -total
Value
x 0.71
ADJUSTMENTS (OPTIONAL) - Complete Part 2 = +0
TOTAL CURRENT CONGESTION MITIGATION GOAL (POINTS) = 4,249 11
The Planning Center City of Diamond Bar
Reporting Period., June 1, 1998 - May 31, 1999
Local Implementation Report
CMP TDM Ordinance
1. Project Number
1. Project Number
2. Strategy
331. Transit Fare Subsidv Program
1
306. CMP TDM Ordinance
3. Project Description
between 6/1/97 and 5/31/98 to 431 per month sold between 6/1/98 and 5/31/99. Senior/disabled pass
sales have increased from 62 per month between 6/1/97 and 5/31/98 to 87 per month between 6/1/98
451,672 sq.ft. were conditioned by
the City's TDM Ordinance.
Available upon request.
3a. Reference Documentation
5. Credit Factor
6. Project Credit Value
Available upon request.
0.2/100 passes (general)
<1
4. Project Scope (Units)
5. Credit Factor
6. Project Credit Value
451,672 s . .
0.30 per 1,000 s . .
136
7. Expected Completion Date
8. Project Cost
9. Local Participation (%)
Complete
Developer Funded
100%
10. Current Milestone
11. Milestone Factor
12. Net Current Value
3
100%
136
Transit Fare Subsidies
1. Project Number
2. Strategy
2
331. Transit Fare Subsidv Program
3. Project Description
The City subsidizes transit passes at 20% and 50% discount for the general public and
seniors/handicapped, respectively. General pass sales have increased from 411 per month sold
between 6/1/97 and 5/31/98 to 431 per month sold between 6/1/98 and 5/31/99. Senior/disabled pass
sales have increased from 62 per month between 6/1/97 and 5/31/98 to 87 per month between 6/1/98
and 5/31/99.
3a. Reference Documentation
Available upon request.
4. Project Scope (Units)
5. Credit Factor
6. Project Credit Value
20 passes/month (general)
0.2/100 passes (general)
<1
25 asses/month (sen/dis)
37/100 passes (sen/dis)
9
7. Expected Completion Date
8. Project Cost
9. Local Participation (%)
current
Prop A
100%
10. Current Milestone
11. Milestone Factor
12. Net Current Value
1
3
100%
9
The Planning Center City o/ Diamond Bar
Repotting Period: June 1, 1998 - May 31, 1999
99-69
Local Implementation Report
Signal Synchronization
1. Project Number
1. Project Number
2. Strategy
246 Park & Ride Facilitv
2
241.5 Signal Svnchronization
3. Project Description
space facility an additional 125 spaces are being constructed. Partial credit claimed for earlier
milestones.
Completion of Counry signal synchronization project. Diamond Bar Blvd (Route 57/LA County
Line). Partial credit received or Milestone 2 in 97/98 Report. Credit amount determined by Countv.
3a. Reference Documentation
5. Credit Factor
6. Project Credit Value
Thomas Guide Page #680 A2
9.6 credits/space
1,200
4. Project Scope (Units)
5. Credit Factor
6. Project Credit Value
July 1998
Credit determined by
33%
10. Current Milestone
County in 97/98 report
11,760
7. Expected Completion Date
8. Project Cost
9. Local Participation (%)
Completed
--
10% local share
1.2% city share
10. Current Milestone
11. Milestone Factor
1
12. Net Current Value
1
3
30%
42
Park -n -Ride Expansion
1. Project Number
2. Strategy
3
246 Park & Ride Facilitv
3. Project Description
The City, in coordination with the State of California, is in the construction phase of expanding the
Diamond Bar Blvd @ 60 Freeway park -n -ride facility. Based on the high usage of the existing 260
space facility an additional 125 spaces are being constructed. Partial credit claimed for earlier
milestones.
3a. Reference Documentation
Thomas Guide Page #640 B7
4. Project Scope (Units)
5. Credit Factor
6. Project Credit Value
125 spaces
9.6 credits/space
1,200
7. Expected Completion Date
8. Project Cost
9. Local Participation (%)
July 1998
$214,000
33%
10. Current Milestone
11. Milestone Factor12.
Net Current Value
3
30%
119
R Coln-0RCALLIR.999
The Planning Center City of Diamond Bar
Repotting Period: June 1, 1998 - May 31, 1999
99-69