Loading...
HomeMy WebLinkAbout03/09/2017 - Minutes - Regular MeetingCITY OF DIAMOND BAR MINUTES OF THE TRAFFIC AND TRANSPORTATION COMMISSION MEETING MARCH 9, 2017 CALL TO ORDER: VC/Mehta called the meeting to order at 7:07 p.m. in the Diamond Bar City Hall Windmill Community Room, 21810 Copley Drive, Diamond Bar, California 91765. PLEDGE OF ALLEGIANCE: Commissioner Quan led the Pledge of Allegiance. ROLL CALL: Commissioners Mahendra Garg, Cynthia Quan Shokoufeh Mirzaei and Vice Chair Surendra Mehta Absent: Chairman Ed Pechy was excused. Also Present: David Liu, Public Works Director; Kimberly Young, Senior Civil Engineer; Christian Malpica, Associate Engineer (Traffic); John Beshay, Associate Engineer; and, Debbie Gonzales, Administrative Coordinator. I. APPROVAL OF MINUTES: A. Minutes of the February 9, 2017 Regular Meeting C/Garg moved, C/Mirzaei seconded, to approve the Regular Meeting Minutes of February 9, 2017. Motion carried by the following Roll Call vote: AYES: COMMISSIONERS: Garg, Mirzaei, NOES: COMMISSIONERS: None ABSTAIN: COMMISSIONERS: Quan, VC/Mehta ABSENT: COMMISSIONERS: Chair/Pechy If. PUBLIC COMMENTS: None III. ITEMS FROM STAFF: A. Traffic Enforcement Update: 1. Citations: December 2016, January & February 2017 2. Collisions: December 2016, January & February 2017 3. Street Sweeping: December 2016, January & February 2017 MARCH 9, 2017 PAGE 2 T&T COMMISSION IV V VI. C/Quan moved, C/Garg seconded to Receive and File the Traffic Enforcement Update for December 2016, January and February 2017. OLD BUSINESS: None NEW BUSINESS: None STATUS OF PREVIOUS ACTION ITEMS: SCENoung updated the Commission regarding a resident's concerns about the school crossing at Quail Summit Elementary School that was received at the last meeting. Staff immediately reached out to the crossing guard company to get the crossing guard's input on the conditions at that intersection as well as near and around the school. Subsequently, all information was forwarded to the Sheriffs Department for targeted enforcement. ITEMS FROM COMMISSIONERS: None VIII. INFORMATIONAL ITEMS: A. Traffic Signal Infrastructure Upgrades Project, Phase I through Phase III — AE/Malpica — Staff will be releasing the retention to the contractor for Phase I by the end of this month. The Phase II construction agreement has been signed by all parties. Staff will schedule the pre -construction meeting in the next couple of weeks. AE/Malpica provided the City Council reports for Phase I, II and III to the commissioners for their information. B. Willow Heights Construction Update/Diamond Bar Boulevard/Brea Canyon Road Intersection Enhancements AE/Beshay said that the City's portion of the project is complete and Notice of Completion was approved by the City Council. The contractor for the Willow Heights portion is moving forward with their punch list items which should be completed within the next couple of weeks, weather permitting. C. Adaptive Traffic Control Signal System — RFP — AE/Malpica — Staff continues to work with the City's consultant to select the final system. D. Copley Drive/Golden Springs Drive Intersection Enhancements — AE/Malpica — Staff will take a design contract to a future City Council meeting for consideration soon. E. Battery Backup Project —AE/Malpica — Staff held a pre -construction meeting with the contractor on February 27. The start date for construction has not been determined due to material procurement. Once the contractor provides a delivery date, staff will issue the Notice to Proceed. MARCH 9, 2017 PAGE 3 T&T COMMISSION F. Area 5 Road Maintenance Project —AE/Beshay—The project is currently in the design phase and due to be completed by the end of March with construction to commence in June. G. Lemon Avenue Interchange Project—SCE/Young -This project continues to move forward somewhat behind schedule due to rain. At the end of March/beginning of April, the contractor will need to impose afull road closure to complete storm drain work on Lemon Avenue which will be conditioned to be done overnight Friday into Saturday or Saturday night into Sunday. Staff will notify affected residents and businesses accordingly. The project is expected to be completed by next summer. H. SR -57/60 Conftuence Project — SCE/Young — It is expected that the westbound onramp along Grand Avenue portion will be completed by this summer. The next major portion of the project is to build a large retaining wall along the vacant portion behind the former Honda/Burger King property. The westbound off ramp portion of the project continues with demolition of portions of the wall along the existing westbound off ramp at Grand Avenue. I. Grand/Golden Springs Intersection Improvements Update— SCE/Young— During last week's Project Team Development meeting the designer (WKE) submitted their 90 percent plans which are currently in plan check. The landscape design process continues and the need to acquire additional right- of-way from the golf course to accommodate the widening of the intersection has delayed the project slightly while negotiations with LA County proceed. The project design is scheduled to be completed by October at which time the project will go out to bid for award of contract for construction by December. Neighborhood Traffic Management Program (NTMP) — (Armitos Place Neighborhood) SCE/Young — No additional update. Staff continues to wait for team captains to submit signatures for the petitions for staff to proceed with plans and specs. (Crooked Creek Drive) AE/Malpica — The next Neighborhood meeting is scheduled for Thursday, March 16 at 6:30 p.m. in the Windmill Room. Commissioners are invited to join in the meeting to discuss the preliminary design. K. Morning Canyon Road Rehabilitation Project — SCE/Young — Bids were opened and based on the review, the contract will be awarded in the amount of just over $380,000. Staff plans to go to Council on April 4 for contract award with construction to proceed shortly thereafter. L. Diamond Bar Boulevard/Maple Hill Road Median Modification Project— SCE/Young — The pre -construction meeting was held last week and staff expects construction to begin next week. This project will prohibit left -turns in both directions from Diamond Bar Boulevard onto Maple Hill Road and the MARCH 9, 2017 PAGE 4 T&T COMMISSION condo/apartment complex driveway for the duration of construction which is anticipated to take about three weeks. M. TR 63623 — Southpointe Residential Development/Larkstone Park — SCE/Young — Construction is ongoing. Paving operations for the parking lot are underway and the walkways are being constructed within the park. Permits have been issued for three residential phases with the fourth phase to be issued shortly thereafter. There are a total of ten phases to be constructed. Improvements along Larkstone Drive have been completed and the roadway for Larkstone remains open to school traffic. Model homes should be open by the beginning of April. N. Diamond Bar Ranch Shopping Center (Old Kmart)—Development Update — SCE/Young — The contractor began demolishing the parking lot and will be re -grading within the next few weeks. The contractor is working feverishly to pull necessary permits for the new buildings. Construction fencing has been in place for a few weeks and has deterred the concern about large semi -truck parking. The entire site cannot be fenced off because access to neighboring businesses south and to McDonald's must be preserved. VI. SCHEDULE OF FUTURE CITY EVENTS: As indicated in the agenda. ADJOURNMENT: There being no further business to come before the Traffic and Transportation Commission, VC/Mehta adjourned the meeting at 7:45 p.m. The foregoing minutes are hereby approved this 9 day of March 2017. G. Liu, Secretary Attest: Vice Chairman Surendra Melita